Document Fragment View

Matching Fragments

5. The brief description and legal status of all the Non - Applicant is summarized as under as per records available in Regional Office, M.P. Pollution Control Board, Gwalior:-

M/s > Global Bio Fuels Title of details Description Supporting Enclosure Location of industry Plot no. C-11, Industrial Area --
                                     Sambre, District Morena, M.P.

Consent validity                     AWH-30.12.2024                             C-5
Industry start year                  2012                                        --
Products      and       production Tyre Processed Oil -1350 TPA                  --
capacity                           Carbon Black -- 1050 TPA.
                                   Steel Wire Scrap-450 TPA

Numbers      of     reactors     and Two Reactors of capacity 10 MT each         --
capacity

Facilities    for       process      Two Automatic PLC System installed          --
temperature       and     pressure
control

Facilities for detection of any One Sensor and One Alarm system                  --
Fugitive Emission control in working shed -- Shed equipped with mist nozzles network.



Action taken (if          Closer Direction U/s 33A of The Water                 C-6
           any)           (Prevention and Control       of Pollution)
                          Act, 1974 & U/s 31             A of The Air
                          (Prevention       and Control      of Pollution)
                          Act,     1981 issued on         23.03.2021 by
                          MPPCB.
     M/s Shree Ram Rubber Industries

    Title of details                         Description                     Supporting
                                                                              Enclosure




 Location of                 Plot no. C-3 Industrial Area Banmore, District                    --
industry                    Morena, M.P.

Consent validity            AW- 14.01.2024                                                   C-7
                            H-14.01.2023                                                     C-8
Industry start year 2018                                                                      --
Products and                Tyre Processed Oil -1600 TM                                       --
production capacity         Carbon Black -- 1400 TM.
                            Steel Wire Scrap-600 TPA

Numbers of reactors Three Reactors of capacity 10 MT each                                     --
and capacity

Facilities   for            Three Automatic PLC System installed.                             --
process temperature
and pressure control

Facilities for              One Sensor and One Alarm system                                   _
detection of                installed.
any       leakage              of
flammable vapours
from systems
Fire fighting               Fire hydrant and water storage                                    --
                            tank provided.
arrangement



Effluent                 treatment Preliminary            and    Physico-Chemical              --

facilities installed                  treatment based ETP of capacity 5 KLD. Treated

Action taken (if any) C-9 Closer Direction U/s 33A of The Water (Prevention and Controlof Pollution) Act.

1974 & U/s 31
 A    of     The     Air     (Prevention     and
                                     Control       of    Pollution)      Act,   1981
                                              issue on 23.03.2021 by MPPCB.




       M/s Star Biofuels Private Limited

      Title of details                            Description                            Supporting
                                                                                          Enclosure

Location of industry        Plot no. C-6. Industrial Area Banmore, District                   --
                            Morena, M.P.


 Consent validity               AW- 04.01.2024                                                C-10
                               11- 04.01.2023                                                C-11
industry• start year           2017                                                           --
Products and production Tyre Processed Oil -2500 TPA                                          --
capacity                Carbon Black -- 2200 TPA.
                        Steel Wire Scrap-9000 TPA

Numbers of reactors and Four Reactors of capacity 10 MT each                                  --
capacity




Facilities      for           procesi    Four Automatic PLC System installed                        --

temperature and pressure control


Facilities for detection of              Two Sensors and One Alarm system                           --
                                         installed
any        leakage           of
flammable vapours from systems


Fire                          fighting   Fire hydrant and water storage tank provided.              --
arrangement
Effluent                treatment        Preliminary and Physico-Chemical treatment                 --