National Green Tribunal

Kantha Vibhag Yuva Koli Samaj ... vs State Of Gujarat on 12 September, 2022

Author: Adarsh Kumar Goel

Bench: Adarsh Kumar Goel

Item No. 02                                                           Court No. 1


                 BEFORE THE NATIONAL GREEN TRIBUNAL
                           SPECIAL BENCH

                           (By Video Conferencing)


                    Original Application No. 81/2014(WZ)


Kantha Vibhag Yuva Koli Samaj
Parivartan Trust & Ors.                                              Applicant(s)

                                     Versus

State of Gujrat & Ors.                                               Respondent(s)


Date of hearing:    12.09.2022


CORAM:        HON'BLE   MR. JUSTICE ADARSH KUMAR GOEL, CHAIRPERSON
              HON'BLE   MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER
              HON'BLE   MR. JUSTICE DINESH KUMAR SINGH, JUDICIAL MEMBER
              HON'BLE   PROF. A. SENTHIL VEL, EXPERT MEMBER
              HON'BLE   DR. VIJAY KULKARNI, EXPERT MEMBER


Applicant:          Ms. Shilpa Chohan, Advocate

Respondent(s):      Mr. Parth H. Bhatt, Advocate for R-1, State of Gujarat
                    Ms. Supriya Dangare, Advocate for R-4
                    Mr. Maulik Nanavati, Advocate for GPCB
                    Mr. Aniruddha Kulkarni, Advocate for CPCB


                                     ORDER

1. The matter has been put up in pursuance of order of the Hon'ble Supreme Court dated 21.01.2022 in Civil Appeal No. 1046/2019, Kantha Vibhag Yuva Koli Samaj Parivartan Trust & Ors. vs. State of Gujarat & Ors.

2. Grievance of the applicant is against failure of the Surat Municipal Corporation (SMC) to comply with the Solid Waste Management Rules, 2016. It is stated that such violations have resulted in contamination of local water bodies and groundwater and also resulted in air pollution due to burning of waste.

1

3. The Tribunal after issuing notice on 08.08.2014, passed orders dated 20.03.2015, 22.12.2015, 07.03.2016, 16.05.2017, 19.09.2017, 06.11.2017, 02.07.2018 and 17.07.2018 requiring the SMC to take necessary steps and file compliance report.

4. However, on 28.09.2018, a Bench of this Tribunal disposed of the application giving liberty to the applicants to raise their grievance before a Monitoring Committee constituted by the Tribunal to verify compliance status. The said order was challenged by the applicants on the ground that the Committee was not substitute for consideration of the grievance of the applicants. The said order has been set aside by the Hon'ble Supreme Court with a direction to the Tribunal to commence hearing of the matter from the stage prior to order dated 28.09.2018.

5. Accordingly, we have considered the matter from the stage prior to order dated 28.09.2018.

6. The SMC has filed an affidavit dated 08.09.2022 giving the compliance status of the waste management projects as follows:

"    Sl.                               Project
     No.                               completion
                                       Schedule      as
                                                                              Balance   Work
           Project          Project    acknowledged
                                                           Present Status     and timeline to
           type             capacity   by          Hon.
                                                                              complete
                                       Tribunal      in
                                       order      dated
                                       16.05.2017
     1     Plastic Waste    100 TPD    First phase of      Present            Surat      Municipal
           Collection and              20      TPD    of   Capacity      of   Corporation      has
           Treatment                   processing          Plastic            entered into MoU
                                       plant          is   processing         with    ICLEI-Local
                                       completed and       plant is           Governments
                                       project is under    approx.      70     for
                                       commission          TPD and SMC         Sustainability,
                                       stage.              has                 South Asia for
                                                           approximately       Implementing
                                                           Segregated          "Alliance        +
                                                           and Treated         ICLEI Developing
                                                           25,000 MT of        Plastic Waste-
                                                           Plastic Waste       Free       Cities"
                                                           in last 12          Project in Surat
                                                           months.             dated
                                                                               03.11.2021, the
                                                                               main aim of this




                                                                                              2
                                                                       MoU will be
                                                                      implemented with
                                                                      an aim to prevent
                                                                      mixing of plastic
                                                                      in the
                                                                      environment and
                                                                      promoting circular
                                                                      solutions.
                                                                      ICLEI       South
                                                                      Asia           will
                                                                      provide
                                                                      technical
                                                                      support to SMC
                                                                      for developing a
                                                                      plastic     waste
                                                                      management
                                                                      strategy      and
                                                                      action       plan
                                                                      along with      its
                                                                      implementation
                                                                      roadmap.         In
                                                                      addition to this,
                                                                      ICLEI South
                                                                      Asia will also
                                                                      identify a specific
                                                                      Financially viable
                                                                      and scientifically
                                                                      sound
                                                                      implementation
                                                                      project, to be
                                                                      submitted to the
                                                                      Alliance for
                                                                      funding
                                                                      consideration.
                                                                      The project
                                                                      duration is still
                                                                      Dec.-2024.
2   C & D Waste      200 TPD   Civil work for     SMC has            No further work
    collection and             First phase of     successfully       required.
    treatment                  100 TPD of         commissioned
                               processing plant   C&D waste
                               is under active    processing plant
                               progress and              of
                               likely to be       approx. 300
                               completed by       TPD on PPP
                               June 2018.         mode at
                                                  Kosad, Surat
                                                  since Jan-
                                                  2019, and has
                                                  approximately
                                                  Segregated and
                                                  Treated 30,000
                                                  MT of
                                                  Construction
                                                  and Demolition
                                                  Waste in last 12
                                                  months.


3   E-waste          5 TPD     Civil      work    SMC         has    No further    work
    collection and             processing plant   awarded      the   required.
    treatment                  is under           work    for   E-
                               active progress    Waste
                               and likely to be   Management on
                               completed     by   PPP mode at
                               March. 2018.       Unn-Surat, the
                                                  construction of




                                                                                     3
                                                    the said Plant is
                                                   completed and
                                                   commissioned

4.   Organic          220 TPD   Installation       Following            More than, 600
     Waste                      work          of   Decentralized        TPD of Organic
     collection and             various            Organic waste        waste processing
     treatment                  projects having    processing plant     shall         be
                                total capacity     have        been     establish     in
                                of 55 TPD has      installed            next 24 months.
                                been               And
                                completed and      commissioned
                                for remaining,     at        various
                                sincere efforts    places
                                have       been                    i
                                taken for          n Surat City and
                                decentralized      has
                                organic waste      approximately
                                treatment          Segregated and
                                plants.            Treated 30,000
                                                   MT of Organic
                                Complete
                                                   Waste in last 12
                                system        of
                                                   months.
                                management
                                for     organic
                                                   A.    APMC
                                waste shall be
                                                         Market: 50
                                completed and
                                                         TPD
                                operative    by     B. Anjana
                                March, 2019 in           Transfer
                                a       phased           station:1
                                manner.                  TPD
                                                    C. Veg
                                                         market: 4
                                                         TPD     (15
                                                         nos)
                                                    D. Vermicom
                                                         post      at
                                                         garden: 2
                                                         TPD
                                                    E. Bulk
                                                         Residential
                                                         Society: 18
                                                         TPD     (82
                                                         nos)
                                                    F. Hotels and
                                                         restaurant
                                                         waste: 12
                                                         TPD
                                                   (through private
                                                   operators)

5    Industrial       100 TPD   By December,       Separate             At         present,
     textile waste              2018               Collection           industrial textile
     treatment                                     System for Non-      waste is being
                                                   Hazardous            managed         by
                                                   Industrial           Private     agency
                                                   Textile waste is     SMC intends to
                                                   under progress       establish      own
                                                   since Oct 2018,      facility       and
                                                   and                  Baseline         &
                                                   approximately
                                                                        Feasibility study
                                                   10,000 MT of
                                                                        for the same has
                                                   Waste         is
                                                                        been started. It is
                                                   collected   and
                                                   disposed of in       likely that State
                                                   scientific           of Art plant shall
                                                   manner in last                       be
                                                   12 months.




                                                                                        4
                                                                          establish in next
                                                                         36 months.

 6.   Waste to          1000      By March, 2019      As per the reason mentioned in the
      Energy plant      TPD                           point no. 7 of this affidavit. Waste to
      on PPP basis      (600+                         energy plant was not commissioned
                        400                           due to uncertainty of Power tariff.
                        TPD)                          SMC has invited short term       waste
 7.   Waste       to    600 TPD   By June. 2019       processing tender to process the
      energy plant                                    waste by composting and approx.
      on EPC basis                                    5,12,952 MT of Waste has been
      /PPP     basis                                  treated under the said premises in
      which is more                                   last 12 months. Moreover, till the time
      appropriate                                     New Centralized Waste processing
 8    Waste to          600 TPD   Installed    and    plant or Waste to Energy plant is not
      compost plant               plant          is   established, SMC has invited tender

functional and in for processing of approx. 30 Lakhs MT operation. of waste in next 3 years.

Total final capacity 2825 "

of processing plants TPD

7. It is further mentioned that following steps have been taken for compliance of the SWM Rules, 2016:

"6. xxx .....................................xxx..........................xxx i. Through 8 Nos. of Material Recovery Facilities established in the entire city area out of which 3 nos. are Mechanized MRF, SMC is recovering around 180 to 200 MT of various material which are further send to authorized recyclers for reuse.
ii. As directed by Hon. Tribunal in order dated 18.04.2017 which states that, "Considering hazard to environment due to open dumping of MSW and extent of landfill sites Cell No. I and II being available for accommodating for processing of MSW, we direct that there shall be no open dumping of MSW at Khajod open site." I submit that the Surat Municipal Corporation has dumped inert residue left after processing and untreated Waste at Sanitary Landfill Cell No. 2 facility located at Khajod Disposal site, and has standby SLF facility of approx 8,25,000 m3 capacity at Sanitary Landfill Cell No. 1 located at Khajod Disposal Site. Thus, there has been No Open dumping of Waste at Khajod Disposal Site and also there has been no Fire incidents since Last 2 years in Khajod Final Disposal Site.
iii. As acknowledge by Hon. Tribunal in order dated 18.04.2017, as per the affidavit submitted by Surat Municipal Corporation dated 26.09.2016 revealing Detailed Project Report annexed as Annexure J, which proposes to Cap Dumpsite where dumping was done on 61.2 hact. land and as per the Directions given by Hon. Tribunal in order dated 16.05.2017 which states, " Leaned counsel appearing on behalf of the Corporation further submits on instructions 5 that the issue of closure of Khajod dumping site, is presently pending before the Standing Committee of the Corporation, and the moment the Standing Committee takes decision the work order will be issued for commissioning the closure/capping of the open dumped site and the closure will be completed within eighteen (18) months thereafter, excluding Monsoon Seasons. We, therefore, direct the Standing Committee to take a decision and issue work order for commencing the work of closure of Khajod open dumping site within one month." I submit that the Surat Municipal Corporation has issued Work Order pertaining to said work dated 16.06.2018 and work is completed on 15.01.2020 as per the design and details provided by enlisted MoUD approved consultant Ms. Facile Maven Pvt. Ltd Surat. Which includes around 8 Nos. of Leachate Collection and Monitoring Wells as well as approx. 40 Nos. of Cowl Vent for Gas exhaustion. Before and After Photographs said projects are attached herewith as Annexure-2.
iv. I submit that as per the order passed in O.A.No.606 /2018, Monitoring committee comprising of Hon'ble Retired High Court Judge Shri B.C. Patel and the then Member secretary, GPCB has visited Khajod disposal site dated 09.05.2019 and Surat Municipal Corporation has undertaken works as per the instructions and suggestions received from the Committee.
v. In due consideration of the site visit undertaken by Monitoring Committee members Retired Hon. Justice shri B.C. Patel, Member Sectary, GPCB Shri K.C. Mistry dated 09.05.2019 at Khajod disposal site. As per the direction received from the members, Surat Municipal Corporation has undertaken the work related to Biomining of old dumped legacy waste location in sanitary landfill cell no.2 and Bhatar through work order dated 24.04.2020 and presently more than 12 lakh MT of waste is bioremediated and work shall he completed by next 18 months. The Corporation is taking all due steps to achieve the compliance envisaged under the SWM Rules. I would say that, after the completion of this work, there would be no waste found lying at the disposal site. expect fresh waste which will be receiving at site on day-to-day basis.
vi. For generating Bio-gas from the wet waste, tender for "Design, Build, Finance and Operate 600 TPD Capacity Bio- CNG (CBG) Plant for Treatment of Source Segregated Organic Fraction of Solid Waste and other Biodegradable Waste at Surat on PPP Model is been invited and it is expected to be commissioned within next 24 months.
vii. Also, tender for establishing 200 TPD Capacity (Phase Manner) of Biogas Plant With Suitable Technology for treatment and processing of Organic Wet Waste as per the Provisions of Solid Waste Management Rules 2016 including Design, Construction, Erection, Testing And 6 Commissioning along with successive operation and maintenance for the period of 15 Years in Surat under 15th Finance Commission Mission and Swachh Bharat Mission on EPC model is been invited and it is expected to commissioned within next 12 months.
With the objective to make all cities clean and garbage free, with 100% scientific processing of Municipal Solid Waste, Govt of India has launched Swachh Bharat Mission 2.0, in the said mission grants will be provided to ULBs for the establishment and upgradation of processing waste facilities, considering the same Surat Municipal Corporation has kept the budgetary provision for the below mentioned works under the said scheme. The Copy of City Solid Waste Action Plan prepared as per the guidelines of SBM2.0 is attached herewith as Annexure 3.
i. Bio methanation and Incineration Plant for Collection, Treatment and Processing of Offal Waste including Collection of Small and Big Dead Animals with 0 & M within Surat city limit whose tender arc been received and presently under scrutiny and it is expected to commission within next 12 months.
ii. Development of New Waste Management Park including the Centralized Waste Processing Plant, Sanitary Landfill Cell and Relevant Road, Parking Weigh Bridge and Necessary Infrastructure as per the requirement of Site and it is expected to commission within next 36 months.
7. Furthermore, Surat Municipal Corporation has awarded 1000 TPD Waste to Energy project to M/s Rochem Separation Pvt Ltd in the year 2012 on PPP basis, wherein Surat Municipal Corporation has to provide land on token rate and rest all of responsibilities is of the Contractor. Contractor has to obtain necessary permission, finalization of power tariff, financing the plant, design, and execution of the project. The said Waste to Energy Project has obtained secure power tariff @ Rs 7.74/ kwh from GERC on 04.08.2015 in response to their petition no. 1443/2014. Unfortunately, the approved power tariff by GERC has been challenged in the Gujarat Electricity Regulatory Commission (GERC), where Project Proponent has already signed PPA for sale of power with Gujarat Urja Vikas Nigam Limited (GUVNL) for approved tariff of Rs 7.74/ kwh and thus in absence of final tariff order the project proponent fails to achieve Financial Closure and ultimate has not executed the project. In context to same Surat Municipal Corporation has terminated the project and the Bank Guarantee of Rs. 1.00 Crore has been forfeited. The details are attached herewith as Annexure-4.
8. In subsidiary to above project, Surat Municipal Corporation has awarded 1200 TPD Waste to RDF to Energy Project to M/s Abellon Clean Energy Limited in the year 2017 on PPP basis, wherein Surat Municipal Corporation has entered into concession agreement with project proponent on 23.07.2022 and provided land on token rate vide lease deed agreement 17.02.2021. As per 7 the terms laid in concession agreement contractor has to obtain necessary permission, finalization of power tariff, financing the plant, design, and complete the construction and execution of the project by 22.08.2022. Unfortunately, the power tariff for the said project has yet not finalized by Gujarat Electricity Regulatory Commission (GERC) due to which Power Purchase Agreement has not been signed and accordingly project proponent till date has not started the execution of. In context to same Surat Municipal Corporation has served the final termination notice to the project proponent and procedure for forfeiting the Bank Guarantee of Rs.

1.50 Crore will be initiated accordingly. The details are attached herewith as Annexure-5. I further pray to the Hon. Tribunal to direct the Gujarat Electricity Regulatory Commissioner to finalize the tariff for the Waste to Energy projects as soon as possible so that successful commissioning of Waste to Energy projects can be undertaken.

9. I say that in the absence of execution of Waste to Energy projects, Surat Municipal Corporation has carried out the waste processing by procuring the works through short term tendering and maintain the norms laid in SWM Rules 2016. Presently Surat Municipal Corporation has upgraded the existing facility of Waste to compost Plant, up to 1350 TPD capacity and approx. 5,12,952 MT of Waste has been treated under the said premises in last 12 months."

8. As against above, the applicant has filed status report dated 10.09.2022 giving the compliance status as follows:

" Sl No. Action Points Conditional Status of submitted by undertaking implementation Applicants dated Submitted by R- 4/SMC 19.09.2017 dated 26.09.2017 8
1. Setting up of Waste to Energy Plant for There is no implementation Waste to Energy plant 1000 TPD has been of this undertaking. No for 1000TPD at proposed to set up at Work has been initiated Khajod Land Fill Site, Khajod land fill site at Sr. and no tender for the work at Survey No. 111/A, No. 111/A, Khajod has been granted for WTE Khajod, Taluka Taluka Choryasi,District Plant. There were only Choryasi, District Surat, Gujarat within a MoUs signed with Rochem, Surat, Surat, Gujarat period of 24 months. Abelon and NTPC but there (hereinafter referred Land Lease Deed has is no implementationon the to as 'Khajod Land Fill been also executed for ground. Site') within a periodof the location atKhajod.
          24 months.                [Further        in       any
                                    circumstance, shifting of
                                    this plant is required,
                                    then             alternative
                                    arrangement shall be
                                     made in advance to
                                     comply      with      SWM
                                     Rules, 2016.
                                   It is pertinent to note that
                                   other work of 1200 TPD
                                   waste to energy plant has
                                    been awarded to M/s
                                   Abellon Clean Energy Pvt.
                                   Ltd.
     2.   Setting up of Waste to Waste             to Energy        Same as above. No
          Energy Plant on EPC        Plant on EPC or PPP            implementation.
basis for 600 TPD at basis, whichever Khajod, Surat ( as financially viable, for Mentioned in 600 TPD will be Additional Affidavit completed within a Dated 6th May 2017 of period of 24 months.
          Respondent no.4
          i.e. Surat Municipal
          Corporation       (SMC))
          within a period of 24
          months.
3.        Proper Operation of That             for      efficient   600 TPD Plant is
          Waste to Compost operation for Waste to                   operational but       100%
          Plant for 600TPD to its Compost Plant for 600             processing is not taking
          full capacity at Khajod TPD to its full Capacity          place at the compost plant.
          Land Fill Site            at Khajod landfill site
                                    sustainable efforts will
                                    be made and it will be
                                    monitored at highest
                                    level.

4.         Extension of Sanitary      Extension of Sanitary         Extension    of   Sanitary
           Land Fill Cell No.1        Landfill cell No. 1 will      landfill  cell   No.1    is
           within a period of 15      be completed within &         completed,          though
           Months (as mentioned       period of 15 months           unaware as to permission
           in Additional Affidavit    (excluding monsoon).          from GPCB for its use.
          Dated 6thMay 2017 of
          Respondent no. 4 i.e.
          Surat Municipal
          Corporation (SMC))




                                                                                           9
 5    Capping      of   Open     Capping     of open           30 lac legacy waste dump
     dumped- accumulated        dumped accumulated            has been remediated at
     waste     at    Khajod     waste at Khajod land fill     Khajod and Bhatar site.
     Land Fill Site within a    site will be completed        Capping      has     been
     period of 18 months        within a period of 18         completed.
     (as mentioned        in    months        (excluding
     Additional Affidavit       monsoon.
     dated 6th May 2017 of
     Respondent no.4
     i.e. Surat Municipal
     Corporation (SMC)).

6.   Enforcement of             Implementation      for       Segregation is not taking
     segregation of MSW at      segregation of MSW at         place    at    household,
     Household,                 household, Commercial,        Commercial, and industrial
     commercial and             and industrial level shall    level
     industrial level           be followed through IEC
                                activities            and
                                subsequently       would
                                lake stringent action in
                                accordance            with
                                proposed public health
                                byelaws,
7.   Door-to-Door collection    Door to Door collection       Transportation    and
     of segregated MSW          of    segregated      solid   Segregation of MSW is not
     from all households        waste        from       all   taking place at household,
      Including slums and       households       including    Commercial, and
      informal settlements,     slums and informal            industrial level
      commercial,               settlements,
institutional and other commercial, non-residential institutional and other premises, multi- non residential storage buildings, premises, from multi- large commercial storage buildings, large complexes, malls, commercial complexes, housing complexes as malls, housing per MSW Rules, 2016 complexes as per rule ( Rule 15 (b) MSW rule (Rule I5(b) Shall be effectively started within 6 months and will be further strengthened within 12 months.
8 Framing of Bye- Public health byelaw, Status as to its laws incorporating approved by general approval by State the provisions of board of Surat Government is not these rules within Municipal Corporation, known. a period of one incorporating the year and ensure its provisions of SWM implementation as rules, which shall be per Rule 15 (e) implemented as per rule MSW Rules, 2016 15(e) MSW Rules 2016 after the final approval from State Government.
10
9 Setup material Material recovery' Material recovery' facilities recovery facilities or facilities or secondary or secondary storage secondary storage storage facilities for facilities for sorting of facilities for sorting of sorting of recyclables recyclables materials has recyclable materials materials such as 21 not been set up for the and waste nos. of collection MSW generated.
      depositions centres for     center       for plastic
      domestic hazardous          waste          already
      waste as per Rule 15        operational,     whereas
      (h)                         collection centre for
                                  C&D waste (7 nos.), E-
                                  Waste (2 nos), and
       (i)  MSW         Rules,      waste depositions center
       2016                         for domestic hazardous
                                    waste as per rule 15(h)(i)
                                    MSW rule, 2016 will be
                                    set up within 24 months.
                                    Surat Municipal
                                    Corporation has already
                                    started Plastic waste
                                    management center
                                    at Bhatar        and at
                                    present waste is being
                                    collected throughvarious
                                    sources, and treated
                                    plastic waste is being
                                    used for road making etc
                                    and 13,000 rmt roads
                                    are      constructed by
                                    using 50 MT of plastic
                                    waste.
10.   Ensure                      Separate transportation      Segregation of entire
      transportation       of     of      segregated     bio   MSW not being done.
      segregated         bio-     degradable waste to the
      degradable waste to         processing facilities like
      the          processing     compost plant,       bio-
      facilities like compost     methanation plant or
      plant,             bio-     any such facility as per
      methanation plant or        rule 15(q) MSW Rule,
      any such facility as        2016 shall be initiated
      per Rule 15 (q) MSW         within 6 months and
      Rules, 2016                 strengthen in 12 months
                                  Corresponding           to
                                  initializing          and
                                  strengthening door to
                                  door waste collection
                                  system.




                                                                                       11
 11.   Involve communities in      Involvement of               Community
      waste management            communities in waste         involvement in waste
      and promotion of            management and               segregation is    very
      home compositing, bio-      promotion    of     home     less.
      Gas generation,             Composting,       bio-gas
      Decentralized               generation,
      processing of waste at      decentralized
      community level as          processing of waste at
      per     Rule    15(t)       community level as per
      MSW Rules, 2016             rule 15(t) MSW rule,
                                  2016 is being already
                                  implemented      through
                                  formation of policy for
                                  financial         capital
                                  assistance, rebate in
                                  annual user charges,
                                  facilitated      through
                                  mobitrash, however the
                                  same        will       be
                                  strengthened within 6
                                  months.
12.   To ensure setting up        Setting up of centers      No such centres have
      centres for collection,     for            collection, been established.
      segregation and             segregation and storage
      storage of segregated       of segregated wastes,
      wastes              are     are incorporated       in
      incorporated         in     building plan while
      building plan while         granting approval of
      granting     approval       building plan of a group
      of building plan of a       housing society or market
      group         housing       complex as per rule 15(ze)
      society or market           MSW rule, 2016 has been
      complex       as      per   made mandatory and will
      Rule 15 (ze) MSW            be verified and monitored
Rules, 2016. at regular intervals, 13 To frame bye laws Public health bye- Status as to its and prescribe laws and prescribe approval by State criteria for levying criteria for levying of Government is not spot fine for spot fine for persons known. persons who litters or who litters or fails to fails to comply with comply with the the provisions of these provisions ofthese rules rules as as per rule 15(zf) MSW per Rule 15 (zf) rule, 2016 has been MSW Rules, 2016 prepared, approved by general board of SMC and forwarded to state government for their final approval. SMC is committed for implementation of this rules after the approval from State Government.
12
14. To stop land filling There shall be no There is dumping of or dumping of Land filling or dumping of Partly processed and unprocessed and unprocessed and mostly of unsegregated MSW unsegregated MSW unprocessed and in SLF Cell No 1 and in SLF Cell at Khajod unsegregated MSW 2 Khajod Land Fill landfill site after2 in SLF Cells.
      Site.                       years subject to 100%
                                  working of Solid Waste
                                  processing plants and
                                  success      of   source
                                  segregation of waste

15.   To only dump non-           There shall be dumping       There is dumping of
      usable,            non-     of non- usable, non-         Unprocessed         and
      recyclable, non bio-        recyclable,            non   unsegregated MSW in
      degradable,        non-     biodegradable,        non-   SLF Cells.
      combustible and non-        combustible and non-
      reactive inert waste to     reactive inert waste to go
      go to Khajod Land Fill      to Khajod landfill site as
      Site as per Rule 15 (zi)    per rule 15 (zi) MSW Rule,
      MSW         Rules, 2016     2016 after 2 years
                                  subject to 100% working
                                  of Solid Waste processing
                                  plant and success of
                                  source segregation of
                                  waste.

16    Setting     up of a         Setting up a Monitoring      Pursuant to the order
      monitoring                  Committee to oversee         passed by the Ld. NGT,
      committee             to    implementation and           monitoring committeewas
      oversee                     operation of waste           formed which held only 1
      implementation              processing plants/ units     meeting. SMC has not
      and operation         of    at Khajod landfill site      convened any meeting of
      waste        processing     involving technical          the monitoring committee
      plants/units          at    expert from reputed          to ascertain the status of
      Khajod      Land     Fill   institutes would be done     implementation.
      Site involving local        within 1 month.
      stakeholders.
17.   To ensure               Provide waiver regarding         As per order dated
      implementation as       deposit       a       Bank       02.07.2018,        Rs    2
      per the timelines       Guarantee to NOT as              Crore bank Guarantee
      SMC to deposit a Bank desired by the applicant           was to be submitted by
      Guarantee to NGT,       as being a government            SMC/R- 4 for adhering to
      Pune which should not body, SMC is duty bound            the timelines given by
      be less than 100 crore. to comply with the               them. To ascertain if
                              provision of all applicable      Bank Guarantee       was
                              rules arid acts.                 submitted by R-4/SMC. If
                                                               it was submitted then it
                                                               needs to be forfeited as
                                                               timelines for
                                                               implementation have not
                                                               been followed.




                                                                                      13
 18. To ensure continuation    To provide waiver               State Government had
    of Khajod Land Fill       regarding, below                allocated 188 ha land at
Site for its designated mentioned action point Khajod to R-4/SMC for use and as per suggested by applicant, setting up Sanitary authorisation from "ensure continuation of Landfill cells and for GPCB and not to divert Khajod landfill site for its processing facilities for the land for another designated use and as scientific management of purposes. per authorization from MSW. The Khajod MSW GPCB and not to site has allocated by the divert the land for State Government for another purposes" developing 'DREAM CITY' Surat Municipal The Khajod MSW site is Corporation has now part of the already submitted Master Plan of Dream requirement to the City. There is no Collector, Surat_ for alternative site/ land allotment of Land at allocated by the District Mandrel and Bhandut of Collector to R-4/SMC for Olpad taluka, Dist Surat, MSW disposal site. Also, it shouldbe Further, the use of noted that part land of landfill site for Khajod MSW site is also a commercial and part of KHUDA (Khajod institutional site is a Urban Development health hazard. Until an Authority) which is alternative MSW site is planning to develop allocated, developed, a Dream city project in a process that may take phased manner. upto 3-4 years, there cannot be any diversion or construction permitted over the existing Khajod MSW site as stipulated in the Masterplan for dream City. Ld. NGT needs to stay any development works over the 188 ha Khajod MSW site. So there cannot be a waiver of this condition. The present Khajod Landfill site comprising of 188 acres for which authorization has been given by GPCB cannot be diverted for any other purpose.
19. Open burning should That open burning should There is no opening not be there at any cost not be there in the old burning of MSW. in 188 hector entire dumps at MSW, site after Boundary wall around Khajod MSW site. completion of capping the site has not been Odour control measures work. constructed to prevent to be undertaken stray animals from entering the MSW site. An accident involving a ragpicker took place on account of the site being open. "
14

9. Though CPCB has filed an affidavit dated 09.09.2022, the same does not advert to the factual position.

10. We have heard learned Counsel for the parties. However, in view of factual dispute about compliance status, factual verification on the ground is necessary, particularly when the GPCB has not furnished its independent report on the subject. Let it be done now jointly by CPCB and GPCB. GPCB will be nodal agency for coordination and compliance. It may file report with factual statistics on each aspect of the waste management

- municipal solid waste, plastics, C&D, E-waste and the waste from textile industries. The report may also provide details of quantity of waste generation and processed under each category. It may also mention the capacity of processing plants designed with their actual utilization status. Report may give quantified legacy waste in existence and arrangements with authorized end-users to use components arising out of biomining/processing plants. Observation may also be given on maintaining integrity of capped landfill site giving reasons for capping in place of biomining. Finally, PCB may mention compliance status and if there are violations, action taken/proposed, including liability for compensation on polluter pays principle, if violations exist.

List again on 19.09.2022.

Adarsh Kumar Goel, CP Sudhir Agarwal, JM Dinesh Kumar Singh, JM 15 Prof. A. Senthil Vel, EM Dr. Vijay Kulkarni, EM September 12, 2022 Original Application No. 81/2014(WZ) DV 16