Showing contexts for: procured document in The Dcit, Circle - 3(1),, Visakhapatnam vs M/S Rashtriya Ispath Nigam Ltd.,, ... on 22 November, 2017Matching Fragments
2.2 SCOPE OF WORK In consideration of the payments to be made by the Employer the Principal Contractor shall be responsible for the following:
2.2.1 Design, supply of drawing & documents procurement of materials, manufacture/fabrication, inspection, testing and supply of all indigenous Equipment on F.O.T. works basis within the time stipulated in Schedule 4 (DELIVERY).
The Equipment/Items are to be suitably and securely packed for road transport in India and for storage under tropical conditions. 2.2.2 Supply of all equipment foundation bolts including bolts of special design, if any and those made of alloy/special steels, if an and indigenous special embedment, if any that may be required for the Equipment on F.O.T. works.