1. Bargi Project
2. Tawa Project near Hoshangabad
3. Punasa Project and
4. Broach Project Based on the recommendations of the aforesaid Ad-hoc Committee, estimates for investigations of the Bargi, Tawa, Punasa (Narmadasagar) and Broach Projects were sanctioned by the Government of India in March, 1949.

The Central Water & Power Commission carried out a study of the hydroelectric potential of the Narmada basin in the year 1955. After the investigations were carried out by the Central Water & Power Commission, the Navagam site was finally decided upon in consultation with the erstwhile Government of Bombay for the construction of the dam. The Central Water & Power Commission forwarded its recommendations to the then Government of Bombay. At that time the implementation was contemplated in two stages. In Stage-I, the Full Reservoir Level (hereinafter referred to as FRL) was restricted to 160 ft. with provision for wider foundations to enable raising of the dam to FRL 300 ft. in Stage-II. A high level canal was envisaged in Stage-II. The erstwhile Bombay Government suggested two modifications, first the FRL of the dam be raised from 300 to 320 ft. in Stage-II and second the provision of a power house in the river bed and a power house at the head of the low level canal be also made. This project was then reviewed by a panel of Consultants appointed by the Ministry of Irrigation & Power who in a report in 1960 suggested that the two stages of the Navagam dam as proposed should be combined into one and the dam be constructed to its final FRL 320 ft. in one stage only. The Consultants also stated that there was scope for extending irrigation from the high level canal towards the Rann of Kutch.

The Khosla Committee report could not be implemented on account of disagreement among the States. On 6th July, 1968 the State of Gujarat made a complaint to the Government of India under Section 3 of the Inter- State Water Disputes Act, 1956 stating that a water dispute had arisen between the State of Gujarat and the Respondent States of Madhya Pradesh and Maharashtra over the use, distribution and control of the waters of the Inter-State River Narmada. The substance of the allegation was that executive action had been taken by Maharashtra and Madhya Pradesh which had prejudicially affected the State of Gujarat and its inhabitants. The State of Gujarat objected to the proposal of the State of Madhya Pradesh to construct Maheshwar and Harinphal Dams over the river Narmada in its lower reach and also to the agreement reached between the States of Madhya Pradesh and Maharashtra to jointly construct the Jalsindhi Dam over Narmada in its course between the two States. The main reason for the objection was that if these projects were implemented, the same would prejudicially affect the rights and interests of Gujarat State by compelling it to restrict the height of the dam at Navagam to FRL 210 ft. or less. Reducing the height of the dam would mean the permanent detriment of irrigation and power benefits that would be available to the inhabitants of Gujarat and this would also make it impossible for Gujarat to re-claim the desert area in the Ranns of Kutch. According to the State of Gujarat, the principal matters in disputes were as under:

(vi) Narmada main Canal Sub-committee under the chairmanship of Executive Member, Narmada Conrol Authority.

The Award allocated the available water resources of the Narmada river between the four States. Based on this allocation, an overall plan for their utilisation and development had been made by the States. Madhya Pradesh was the major sharer of the water. As per the water resources development plan for the basin it envisaged in all 30 major dams, 135 medium dam projects and more than 3000 minor dams. The major terminal dam at Sardar Sarovar was in Gujarat, the remaining 29 being in Madhya Pradesh. Down the main course of the river, the four major dams were the Narmada Sagar (now renamed as Indira Sagar), Omkareshwar and Maheshwar all in Madhya Pradesh and Sardar Sarovar in Gujarat. Rajasthan was to construct a canal in its territory to utilize its share of 0.5 MAF.

In the present case we are not concerned with the polluting industry which is being established. What is being constructed is a large dam. The dam is neither a nuclear establishment nor a polluting industry. The construction of a dam undoubtedly would result in the change of environment but it will not be correct to presume that the construction of a large dam like the Sardar Sarovar will result in ecological disaster. India has an experience of over 40 years in the construction of dams. The experience does not show that construction of a large dam is not cost effective or leads to ecological or environmental degradation. On the contrary there has been ecological upgradation with the construction of large dams. What is the impact on environment with the construction of a dam is well-known in India and, therefore, the decision in A.P. Pollution Control Boards case (supra) will have no application in the present case.