Skip to main content
Indian Kanoon - Search engine for Indian Law
Document Fragment View
Matching Fragments
"Actually the assessees applied to the Corporation of Madras vide their letter
dated 23-12-89. Along with this letter, they enclosed photostat copy of the
sale deed, copy of property transfer issued by the Corporation, seven copies
of the demolition plan, seven copies of construction plan and indemnity bond
and affidavit. In one blue print, the plan of the proposed new construction
of 5085 sq.ft. was exhibited. The said building was proposed to be
constructed in ground floor as well as first floor. In this plan, the
Architect Savitha Chowdhry put the date as 4-12-1989. In another blue print
the building to be demolished was shown. The total area to be demolished was
shown at 1852 sq.ft. In the said blue print, the Architect Savitha Chowdhry
put the date as 17-10-89. In the said blue print for which demolition was
applied for, the old building as it existed as per the sale deed dated 9-3-88
was shown. The actual claim of these assessees is that Shri Pradeep Kumar had
undertaken some n ew construction by way of extension to the old existing
building both in the ground floor and in the first floor. This can be seen at
pages 71 and 71A in coloured portion in paper book No.1 filed by Shri Pradeep
Kumar. Shri Praveen Kumar claimed to have constructed a small building of 382
sq.ft. by demolishing the old existing A.C.C. Roofed outhouse of 324 sq.ft.
described in the sale deed dated 6-4-88. They further claimed that they were
unauthorised constructions / extensions and that there were no applications
for approval to the Corporation of Madras and that they were later pulled down
to enable them to go in for an approval and authorised construction."