2. He (Er. Paramjit Singh) on dated 07.08.2015 at the time of checking of Meters at M.E. Lab Goraya, Sub Division Phillaur on the basis of ME Seals and Meter 4 of 13 Neutral Citation No:=2023:PHHC:053124 2023:PHHC:053124 Body being suspicious, at the time of checking of 2 Pack seal Meters of Sh. Krishan Lal Account No. GT35/196 and Sh. Rampal Account No. GT35/177A 3∅, subject of Challan No. 36 dated 07.08.15 3∅ being written as suspicious, in the column of special remark in front of both these meters written as seals suspicious and apart from that despite mentioning checking report number by Task Force, checking of these meters were not conducted properly. He (Er. were not Paramjit Singh) had not mentioned any comments about the purity of the seals of the meter upon the report of this Challan, which goes to prove that he has not conducted the checking of purity of seals of the Meter. He (Er. Paramjit Singh) is directly responsible for above mentioned negligence.

6 of 13 Neutral Citation No:=2023:PHHC:053124 2023:PHHC:053124 even conducted the inspection of the seals of the meter. He (Dwarka Dass) is directly responsible for above mentioned negligence.

2) He (Dwarka Dass) on dated 07.08.2015 at M.E. lab while checking Meter of Sh. Rampal Account No. GT35/177A serial Number 898576, despite the checking team mentioned the comments upon the LCR No. 12/2009 dated 05.05.2015 regarding not blinking of Yellow-phase of the meter, has not conducted checking of working of the meter nor in this regard mentioned any comments upon the challan. He (Dwaraka Dass) is directly responsible for above mentioned negligence.

3) According to the instructions of Chief Engineer/Enforcement Patiala on dated 14.08.2015 these Meters were checked again and seals of the meters were found as fake, ultrasonic welding being tempered, counter covers of the Meters found open, on the basis of which both the Meters were declared as case of pilferage and apart from that it was found that yellow phase terminal at load side is heat up in the Meter of Sh. Rampal Account No. GT35/177A serial Number 898576 and it was found that meter is running slow to the extent of 32%. Likewise He (Dwarka Dass) with malafide intention on dated 07.08.2015 at M.E. Lab Goraya at the time of checking of meter on the basis of suspicion of pilferage of electricity, for not conducting proper checking of meter and not declaring the meters related with the pilferage is directly responsible.

2) According to oral instructions of the then Chief Engg: Enfo. Engg: Darshan Singh orders were passed to conduct Re-checking of these meters under the supervision of Engg: Kuldeep Singh Supdt. Engg: Enfo. Ludhiana and respondent Er. Jagmohan Singh (The then Deputy Chief Engg: Enfo. Jalandhar). Checking of both these meters was conducted on dated 14.08.15. During this checking seals of both these meters were found as fake. Ultrasonic welding being found tempered and counter covers of the Meters found open and the meter of Sh. Rampal Account No. FT-35/177A was found running slow to the extent of 32%, therefore, both these meters were declared pilferage case. Had these meters checked properly by the respondent on dated 07.08.15 then these errors/shortcomings would have come to fore at the same time and case of pilferage can be declared then itself. Therefore, Charge No. 2 leveled upon the respondent goes to prove."