Document Fragment View

Matching Fragments

2. According to case of the prosecution, on 17.12.2008 at approximately 15:30 hours, at Flat No. T-302, Sukhmani Tower, Lalghati, Bhopal, premises belonging to the accused, an inspection was conducted by the Assistant Engineer of the complainant, Shri R.K. Gupta, along with members of the inspection team. During the course of the inspection, it was detected that the accused was committing theft of electricity by unauthorized and illegal use of electrical energy. It was further revealed during investigation that the accused was a registered consumer having a valid electricity connection sanctioned exclusively for domestic use. However, at NEUTRAL CITATION NO. 2026:MPHC-JBP:26144 2 CRA-1956-2026 the time of inspection, the said connection was found to be misused for non- domestic purposes. Specifically, it was observed that the accused had let out approximately 15 rooms within the premises to students of Kusha Bhau Thackeray Nursing Home and was supplying electricity to them through the domestic connection, thereby diverting electricity for commercial/hostel purposes in contravention of the terms and conditions of supply.