Skip to main content
Indian Kanoon - Search engine for Indian Law
Document Fragment View
Matching Fragments
"a. Pass an order directing the NHPC Ltd. and other
respondents to release the minimum sustenance flow of water
of 450 cu3 m/sec from the SLHEP Dam all through the year
for ecological sustenance of the river which will keep the river
ecologically healthy specially in the 4-5 months of lean period
of winter.
b. Pass an order directing the respondents to release this
sustenance water of 450 cu3 m/sec of water 'automatically',
without any human control over it through an 25 sqm opening
at an appropriate level of the dam, as this sustenance water
cannot be shut off even for a short while through human error
or in a mala fide way, or due to various forces majeure
situation.