"1. The work of making service road & Tracks parallel to DFCCIL
track from new pardi Station Building to Lc 90 is being carried out
by DFCCIL (PSU under Ministry of Railways). The contractor
engaged for this work is M/s Express Freight Consortium. This
work is being supervised by PMC-2R (ZMT-2) engaged by DFCCIL.
2. DFCC has constructed Road & formation in its own land after
extending all the existing Railway bridges to dispose the rain
water.
3. As the adjoining complainant's land is in low laying area, water
gets accumulated in his land in the case of heavy rain fall.
4. In the Site visit, the approved drawing 12/AL/DG/1329/-CD REV-
1 submitted by DFCCIL was studied by the committee member.
After analysing the approved drawing, it was found that many
works as mentioned in approved drawing is yet to be carried out by
Contractor of DFCCIL. The work of Retaining wall, drain and nalla
at this location is incomplete. The contractor of DFCCIL should
carry out work as per approved drawing and complete the work at
the earliest so, that no water logging, rain cut and land slide
problem will occur in upcoming monsoon season as it had occurred
in previous two-three monsoon seasons.
5. In site visit it was found that DFCCIL's Contractor is discharging
water to the private land (Photos attached) as there is no proper
drainage arrangement available along the DFCCIL alignment
towards Country side. Further the embankment made by DFCCIL's
Contractor for making road got damaged available along the
DFCCIL alignment towards Country side. Further the embankment
made by DFCCIL's Contractor for making road got damaged during
rainy season due to heavy water flow from DFCCIL tracks resulting
in rain cuts and landslides and disturbing the adjacent private
land. In view of above committee proposed making of retaining
wall of appropriate size all along parallel to the road made by
DFCCIL's Contractor starting from New pardi Station building
(DFC chainage 221/3) to DFC chainage 222/27 (IR chainage
187/520) of length approx 1500 m to retain DFCCIL earth work
and also proposed to make adjacent drain of appropriate capacity
to discharge water to adjacent minor bridges. By making this
drainage arrangement, the water logging problem at this location
will be minimized. A sketch made by committee is also attached
here with for ready reference in Appendix A.
NEUTRAL CITATION
C/SCA/7971/2025 ORDER DATED: 08/07/2025
undefined
6. The pathway of balakhadi drain shifted due to construction of
DFCCIL embankment towards MNB 56. The Balakhadi drain
coming from East side needs to be properly trained. The kutchha
drain length going parallel to DFCCIL land is to be made of
concrete with appropriate size by contractor of DFCCIL so that
water can discharge in to nearest minor bridge no. 56. The kutchha
drain length beyond DFCCIL land may also be made properly so,
that water can be discharged to nearest minor bridge without any
hindrance.