Document Fragment View
Fragment Information
Showing contexts for: human errors in Suresh Jindal vs Bses Rajdhani Power Ltd. on 14 December, 2005Matching Fragments
3. My measurement of KWH (Kilowatt Per Hour) is highly accurate.
4. I have a vast memory and can provide you with the past billing data.
5. I can be read with help of Meter Reading Instrument. This eliminates human errors in recording the transfer of data.
6. I display any of the following problems that may occur at your premises: (i) Earth Leakage, (ii) Problem with neutral and earth wire, (iii) Reverse energy flow, and (iv) Loose wire.
20. A domestic consumer has brought the present action alleging that he is the registered consumer in respect of electricity connection bearing K No. 2540 F 320018 having a sanctioned load of 15 KW. Petitioner states that on 26.4.2003 employees of the respondent came to his premises. Notwithstanding the fact that the existing electro mechanical meter was found in a perfect condition, it was replaced with an electronic meter. It is alleged that as per Rule 57 of the Electric Supply Rules, 1956, the meter was required to be checked before installation and had to conform to the relevant Indian Standard Specification. According to the petitioner ever since the meter was installed he started receiving inflated bills which was proof enough that the meter was faulty.