Showing contexts for: procured document in Indian Oil Corporation Limited vs Megi Control Systems Pvt. Ltd on 5 May, 2011Matching Fragments
7 As per the work order, the contract had to be sequentially performed in four parts, which were-
"(a) Preparation and approval of the drawings and the documents.
(b) Procurement of the materials as required under the work order.
(c) Compliance of statutory requirements such as obtaining Labour and Electrical Inspector's Licences prior to the site being handed over to the Claimant by the Respondent.