Matching Fragments

2.      O.Ps. filed reply controverting his averments and alleged that  On 30.12.2011 the connection of the complainant was checked by Nigam's official in the presence of Smt. Sunita Anchal. Checking report was signed by Smt.Sunita Anchal.  During checking old meter was found installed inside the premises of the complainant and same was removed as per policy of the Nigam and new digital meter was installed outside the premises on the pole. The old electricity meter installed in the premises  of the complainant was property of the Nigam and it was rightly taken away by the members of the checking party.