Document Fragment View

Matching Fragments

Page 62 of 78 Downloaded on : Sat Sep 04 10:33:02 IST 2021
C/WPPIL/141/2020 JUDGMENT DATED: 18/03/2021 3.8.2. Revising a Development Permission Changes or revisions in the sanctioned design and specification of a building may be made if a Revised Development Permission is obtained before construction is undertaken on the portion of the building that deviates from the Sanctioned Design Requirements. Revision of Development Permission shall be mandatory in the following conditions: 1. Change in Ownership 2. Increase in utilised FSI 3. Reduction in Parking area 4. Change in Orientation of the Building 5. Change in size or location of the Common Plot 6. Change in use of Building or part thereof For any of the above mentioned changes in a building during the course of construction, the owner should apply for a Revised Development Permission for the Building‐ for which the building is proposed; (b)unit or part of Building‐ for which the building is proposed; (b)unit as the case may be. The modified Development Requirements may be examined by the Competent Authority for ensuring compliance of the building to these Development Regulations. No deviations in contravention of the provisions of the act, and/or these regulations shall be permitted. Procedures for obtaining a Revised Development Permission are specified in Regulation No. 5.2.