Document Fragment View

Matching Fragments

In order to implement the Solid Waste Management Rules, 2016 and the directions issued by the Principal Bench of National Green Tribunal, New Delhi in O. A No. 606/2018 the following actions are taken by the TNPCB and the concerned urban local bodies:
1. Action taken by Erode City Municipal Corporation:
TNPCB has issued directions under Section 5 of Environment (Protection) Act, 1986 to the Commissioner, Commissionerate of Municipal Administration, Chennai to instruct Commissioner, Erode Corporation to stop dumping of municipal solid waste on the banks of River Cauvery at Vairapalayam, Erode and to comply with the Solid Waste Management Rules, 2016 vide Board's Proc. Dt. 01/08/2018 a. Vairapalayam MSW dumpsite, Erode The Erode City Municipal Corporation has cleared and processed 80850 m of MSW dumped at Vairapalayam MSW dump site. At present, no MSW is available at the MSW dump site. This will prevent the flow of MSW leachate into River and carryover of municipal solid waste in river water during rainy seasons and flood.
   Sl.                  Conditions                                Compliance
  No.
1. The Municipality shall comply The Municipality has complied the Rule with the provisions of the Solid 22 of Solid Waste Management Rules, Waste Management Rules, 2016 for Serial No.1 to 10 and yet to 2016 and shall comply with comply the Rule 22 in Serial No.11 of the orders passed by the Solid Waste Management Rules, 2016, Hon'ble NGT (PB) in regarding time frame for implementation O.A.No.606 of 2018 from time of bio remediation or capping of old and to time. abandoned dump sites within five years from 08.04.2016 (i.e. upto 07.04.2021) Based on the above, Environmental Compensation has been calculated and submitted to Board vide this Office letter dated 26.07.2021.
Time frame for implementing Solid Waste Management Rules, 2016 S. Action Plan Time Line No. 1 110% Door to Door Collection Achieved 2 100% source segregation Achieved 3 Implementation of Solid Waste Management Enforced Rules, 2016 4 Implementation of Plastic Waste Management Enforced Rules, 2016 5 100% Processing and Disposal of wet waste Achieved 6 100% Processing and Disposal of saleable dry Achieved waste 7 100% Processing and Disposal of C&D waste Achieved 8 100% Disposal of E-Waste Achieved 9 100% Processing and Disposal Non Saleable Awaiting Tamil dry waste Nadu Pollution Control Board approval for incinerators 10 Bio mining in Vairapalayam dumping yard Completed 11 Bio mining in Vendipalayam dumping yard It will be completed before 31.12.2021.
                    TIME       FRAME         FOR     IMPLEMENTING           SOLID WASTE
MANAGEMENT RULES 2016

  S.No.                                ACTION PLAN                                     TIMELINE
 1.          100% Door to Door collection                                                Achieved
 2.          100% Source Segregation                                                     Achieved
 3.          Implementation of Solid Waste Management Rules, 2016                        Enforced
 4.          Implementation of Plastic Waste Management Rules, 2016                      Enforced
 5.          100% Processing and Disposal of wet waste                                   Achieved
 6.          100% Processing and Disposal of saleable dry waste                          Achieved
 7.          100% Processing and Disposal of C&D waste                                   Achieved
 8.          100% Disposal of E-waste                                                    Achieved
      9.     100% Processing and Disposal Non-Saleable dry waste                         Achieved
      10.    Bio-mining in Kottakadu dumping yard                                      completed on
                                                                                        28.12.2022
      11.    Bin free status in residential areas                                        Achieved
      12.    Formation of SWM monitoring committee at Municipality                        Formed
             Corporation Level

      13.    Communicating the Reduce Reuse Recycle Concept to the                     Continuous
             community                                                                   process