"3. Restoration/remediation of the site
a. Restoration of site by M/s Essar Power MP Ltd.
The team of district administration and Madhya
Pradesh Pollution Control Board has visited the ash
dyke breached data area on 02.02.2020 to physically
verify the status of restoration work of the site. The
report submitted vide letter no. 1125/RO/PCB2020
dated 17.02.2020 by MPPCB, Singraulli states that the
ash spread over the field and water bodies was
collected and dumped at ash dyke no. 3. The
photographs attached with the report show that ash
spread over the fields was removed and site is
restored. Copy of the report is enclosed as Annexure-
IX. Further after the site collection of ash from the fields
by M/s Essar Power MP Ltd., farmers have sown the
Kharif crop during this monsoon.