Document Fragment View

Matching Fragments

"3. Restoration/remediation of the site a. Restoration of site by M/s Essar Power MP Ltd.
The team of district administration and Madhya Pradesh Pollution Control Board has visited the ash dyke breached data area on 02.02.2020 to physically verify the status of restoration work of the site. The report submitted vide letter no. 1125/RO/PCB2020 dated 17.02.2020 by MPPCB, Singraulli states that the ash spread over the field and water bodies was collected and dumped at ash dyke no. 3. The photographs attached with the report show that ash spread over the fields was removed and site is restored. Copy of the report is enclosed as Annexure- IX. Further after the site collection of ash from the fields by M/s Essar Power MP Ltd., farmers have sown the Kharif crop during this monsoon.