Showing contexts for: Basic engineering drawings in Coimbatore Aero Based Control Sys. (P.) ... vs C.C.E. on 12 October, 1999Matching Fragments
3. The appellants' reply was that they had not manufactured industrial fan. Their plea was:-
(a) They are a team of technocrats and were working as a designing and trading organisation carrying out their business activities at their office premises; they do not manufacture any goods in their premises; that they had specialised in designing humidification systems for textile mills; that taking into account the factors viz. the machine load, lighting load, roof specifications, false ceiling specification and we bulb (sic) temperature, basic drawings for setting up a humidification plant house are supplied; and that the above basic engineering data was later translated by Civil Architects/structural engineering into Civil drawings and designs and working drawings.