"1. It is stated that the Green belt area of society is 8.39% of total area of project as per approved map.
a) 18-meter-wide green belt has not been developed by the project proponent, although its development work was started by them as per the instructions of PCB Palwal on 31.01.2024. It is prayed that the project proponent may be directed to install precast boundary wall on the external side of the green area of the project and wire mesh fencing on the inner side to protect it from stray animals and trespassers.

19.02.2024

1. It is stated that the Green belt area of society is 8.39% of total area of project as per approved map.

a) 18-meter-wide green belt a) a) 18-meter-wide green has not been developed belt area has been by the project proponent, cleared but not although its development developed. Precast work was started by boundary wall has been them as per the partially done. According instructions of PCB to the project proponent, Palwal on 31.01.2024. It the said green belt is not is prayed that the project a part of the project, proponent may be however it is shown in directed to install precast the approved map of the boundary wall on the project. The concerned external side of the green authority (DTCP area of the project and Haryana) may be wire mesh fencing on the directed to produce the inner side to protect it record of the green belt from stray animals and shown in the sanctioned trespassers. layout plan and the actual green belt developed by the project proponent.

A. 18m wide green belt has It is submitted that the 18- not been developed by Meter-wide green belt area the project proponent, land is not the part of although its development Licensed area land of work was started by project proponent. Further them as per the the project proponent has instructions of PCB constructed approx. 200 Palwal on 31.01.2024. It Meter precast boundary is prayed that the project wall on the external site of proponent may be green area of the license directed to install precast area of the township. To boundary wall on the barricade mesh fencing on the external side of the green inner side of the project is area of the project and outside the limits of the project wire mesh fencing on the as there are many Revenue inner side to protect it Raste and village link road from stray animals and passing through the township stray trespasser. and connecting to the villages through the township.

a) 18-meter-wide green have been marked on the copy belt has not been of layout cum demarcation developed by the plan with blue colour. Copy project proponent, attached herewith for reference as although its ANNEXURE-A development work was started by them as per the a. As submitted by DTP vide memo no.

instructions of PCB DTP/M-2233 dated 15-05-2024, it Palwal on is stated that "18.00 mtr wide 31.01.2024. It is green belt is not part of license prayed that the granted colony and it is project proponent proposed green belt along may be directed to proposed 75.00 mtr wide install precast peripheral road on both sides. boundary wall on The same has been marked on the external side of the layout plan of the the green area of the residential plotted colony". project and wire mesh fencing on the Further, during site inspection, it inner side to protect was observed that the precast it from stray animals boundary wall has not been and trespassers. provided by the project proponent.