Document Fragment View
Fragment Information
Showing contexts for: reverse engineering in Mr.R L Makhija vs Mcd, Gnct Delhi on 6 January, 2011Matching Fragments
3. In above mentioned circular, 14 Engineers got reverted back As stated in Para-1 because of issuing of Charge sheet. Please provide the details regarding the above mentioned four Assistant Engineers, Are they revered back as charge sheet is issued against him.
4. If MCD doesn't revert them till date, then how mach time is With regard to reversion of required by the department for reverted these Assistant Engineers. AE(Civil), information is to be Executive Engineers, SE. Please provide the details separately for provided by the Engg. (HQ). In each officer. connection with reversion EE(C)/SE(C) after a period of 01 years, guidelines or Govt. of India doesn't permit.