either in whole or in part in any parking lot or toll plaza or mine or quarry, to another person, other than a public sector ... licensee or lessee") for the use of such parking lot or toll plaza or mine or quarry for the purpose of business shall
basis. Direct tolling method
of revenue generated by constructing
user fee plazas have been proposed.
Based on the traffic study Two toll plazas
are proposed ... purpose of tolling, the project is
classified as two homogeneous sections
to meet the requirement of toll
notification. The toll plaza shall be
provided
smooth flow of
traffic.
Toll plazas are normally situated outside of towns and cities
because when toll plazas are set up in the midst ... Government was not satisfied with toll plaza being set up and according
to the State Government, toll plaza
respondent NHAI, the appellant has
been prevented from commencing tolling at located Toll Plaza at 211 KM and
110 KM due to which ... losing substantial fund due to non-commencing of tolling at the
located Toll Plazas that could have been utilized for the construction of
the project
Constable Shamsher Singh to the toll
plaza Arjeri where PW1 Kuldip Singh, the contractor of the toll plaza
along with five persons ... toll plaza which was being constructed near village
Malik Majra on G.T.Road. He used to be at the toll plaza between 8
Murder
toll road would be required to pay toll. Despite
the interim order, the respondents went ahead with the constructions
of the Toll Plaza and ensured ... established
within a distance of sixty kilometers from another toll
plaza if such toll plaza is for collection of fee for a
permanent bridge
Toll Plaza
at 146.400 Km. and also prescribed the rates for the toll
and in the absence of any subsequent notification the Toll
Plaza cannot ... location determined for the
purpose of locating a Toll Plaza and that a Toll Plaza is to be located
after Independent Engineer appointed
established within a distance of sixty kilometres from another toll plaza if such toll plaza is for collection of fee for a permanent bridge, bypass ... towards user fee collection charges from Chitaura Toll Plaza. The toll plaza was accordingly, handed over to the petitioner.
It transpires that from the initial
back, at about 09:20 p.m., at toll plaza Dhilwan, his
vehicle was stopped by certain persons who were in civil clothes ... CCTV footage of toll plaza Dhilwan reflects that the petitioner along
with his vehicle was hijacked by certain persons in civil clothes
Toll
Plazas etc. on highways and roadways.
2.1 The petitioner has been involved in the toll collection process
from the Rajokri Toll Plaza, an integrated ... agent/NHAI's concessionaire who was
collecting toll from Rajokri toll plaza prior to February, 2014. The
other infrastructural costs/ claims were also denied