down of
Talchar - Kolar, while during the bi-pole shut down
alternate route would have to be explored to ensure full
schedule from Talchar STPP ... correct the
break down, the non-availability of adequate alternate route for
evacuation of power from the Talcher Thermal Power Station to the
Southern Region
will take immediate
steps for taking up the works on the alternative route as
suggested by the Central Electricity Authority in their
Report dated ... campus as suggested by the
Central Electricity Authority on the alternate route for
the transmission line.
Page
pipelines had come
into existence the pipeline of GSPCL providing the alternative route
for transportation which was not available earlier when GSPCL itself
had negotiated ... executed (on
07.10.2005) by GAIL and BPCL, no other alternative route for
transportation existed. The existence of said facts and
circumstances, particularly GTA with GAIL
point supply if
required, in case Licensee does not permit Franchisee route.
Alternately and otherwise owner / manager of the premises i.e.
commercial building / industrial ... point supply if required, in case Licensee
does not permit Franchisee route. Alternately and
otherwise owner / manager of the premises i.e.
commercial building / industrial
cost of electricity in a reasonable
manner
(ii) Two alternative routes are available to distribution licensee
for procurement of power. The licensee has to elect
cost of electricity in a reasonable manner
(ii) Two alternative routes are available to distribution licensee for
procurement of power. The licensee has to elect
this case three alternative routes were provided.
Para 1.5 of the RFP explains about the Survey Report.
Pre-bid meeting(s) are also held
rightly pointed out by Learned Counsel for the
Appellant, two alternatives routes are available to the
distribution licensee for procurement of power viz.
through bilateral
beyond their control, the completion was
getting delayed; most of the pipeline route had to be laid parallel to the
existing national highway, since there ... other; and hence there was "no
alternative route" to lay the pipeline. The Appellant sought deferment of
the completion and commissioning date
contract, the
same cannot be changed midway by insisting upon some alternate route.
It is argued that the appellant no.1 through RRVPN, chose