Bangshibagan as well as to develop and improve the existing
alternate route for passage of pilgrims.
It is to be noted that the connected ... premises and proposed
Access Corridor, and, work of development of the alternate route, to utilised for
Pilgrimage during execution of the construction work.
7. That
provide all route.
the alternate ROW (map)
b(iv) Whether department is liable to Based on survey
propose alternate routes before Techno-commercially
sanctioning ... after a survey, the present route was found to be
most techno commercially viable optimal route. If one route is found
viable and accurate, there
provide all route.
the alternate ROW (map)
b(iv) Whether department is liable to Based on survey
propose alternate routes before Techno-commercially
sanctioning ... after a survey, the present route was found to be
most techno commercially viable optimal route. If one route is found
viable and accurate, there
points of
the Project Highway and serving as an alternative route thereof,
such road being an existing paved road, which has been widened
by more ... ends of the Project Highway,
(ii) which served as an alternative route to the Project
Highway, and
(iii) which was
(a) either an existing paved
Electricity Board, which conceded that there was an alternate
route, but the same was found to be impractical and economically
not feasible. Taking note ... Board. It was found in
Ext.P18 that the alternative route suggested by the petitioners
incurs 40% more cost, that 8 quarries were functioning
cultivation, and would require cutting
and removal of trees. The alternative routes DC and EC as shown in Ext. P2
would cause minimal ... rights of
the landowner while granting permission under section 164. The alternate
routes proposed, specifically proposals no. 2 and 3, were admittedly feasible
and involved
prayer to conduct a fresh study regarding
the feasibility of the alternative routes
suggested. The Writ Petition was disposed ... Section 4 of the RFCTLARR Act, 2013, the
feasibility of the alternative route suggested was
not considered. According to the petitioners, the
alternative route suggested
feet from the
house of the petitioner, which is an alternative route for him. The Naib Tehsildar
after hearing the parties and examining the records ... medh of the respondent Nos.5 to 8 and no other alternative route was
available to him. He has relied upon a Panchnama prepared
acquisition proceedings
and without paying compensation by ignoring the availability of alternate
route adjacent to the petitioners property as illegal and arbitrary, and
contrary ... Electricity Actandconsequentlydirect the respondents
to utilize the alternate route available adjacent to the petitioners property.
1.1 The Petitioners claim to be owners and possessors
this practice has continued from time immemorial, and there is no alternative
route available for carrying the idol to the car. However, in the second ... belong to the respondents' community, and there exists
an alternative route for the temple to carry the idol.
6. Before the trial Court