whose roads are
connected to the roads of the commercial complex, are passing
through these roads without any obstruction; the allegation, that
public access ... obstruction is caused over the roads/road
margin, the person entitled to have such access can enforce that
right. (K.V.K. Janardhanam KVK6; Bharathamatha
Workshop xii. Warehouse xiii. Electrical Substation. xiv. Laboratory xv. Road loading 1.4 Roads. - Access to the moored ships shall be provided. If necessary, a separate ... areas. Roads separating the blocks shall act as firebreaks. iii. Pedestrian pathways should be provided / marked alongside the primary traffic roads. iv. Alternative access shall
Road on either side of flyover near
Chennai Silks and therefore, the road width taken for grant of
planning permission is not the access road ... Road in either side of
the flyover near Chennai Silks. The entrance width of the
Ranganathan Street is 5.6 m and with this road access
sought provisions
of all accessibility requirements to make all visually disabled persons in
support of "safe access to roads and transport facilities ... these persons was accessibility to rights and transport and
safe accessibility to movements on footpaths and accessibility to roads
and transport. The writ petition raised
carriageway sections of all
categories of roads i.e. National Highways, State highways,
Major District Roads and Rural roads in plain, rolling and hilly
terrain ... Intersection with NHs/SHs/MDRs/City Roads 1000 m
(ii) Intersection with Rural Roads/approach roads
to private and public properties
into the state road and using the state road for bathing, washing, watering and defecation ; (8) 'State road' means any road, way or land declared ... State road, the State Road Authority shall make a map showing the alignment of the State road, the State road boundaries, building and control lines
deed of the Petitioner also refers to the existence of the access road of
3.00 mtrs. width only. In such situation, it was submitted that ... Petitioner has no right to carryout the construction on the access road
and therefore, no right to get the relief of interim injunction, which
plot, in question, was such which was not even having the access road. It was further stated that Opposite Parties No.1 and 2 took ... denied that the plot, in question, was not having the access road. It was further stated that the plot was clearly accessible through a motorable
over the possession that
there are certain works like inferior painting, access road, garden plantation
and other issues, which they would take care of immediately ... handing
over possession that there are certain works like inferior painting, access
road, garden plantation and other issues, which they would take care of
immediately
acquisition proceedings. In
the said layout plan there is no road access shown from the
6 O.S. No.1768/2015
western part ... said road is rounded one and the
road claimed in the CA site, which is the suit schedule property is
the short cut road