unlimited access to the licensed land. It
does not specify as to whether the unlimited access could
include access from Timarpur Road. In additional affidavit ... access to the residential area is a
complete access whereas the service access to the commercial
area is a qualified access and this qualified access
contract, it was the duty of NPCC to make available an access road to the downstream portal area where work awarded to the contractor ... Special Conditions of Contract.
60. Admittedly, the access road was provided only on 27.02.1986. Thus, for executing the works awarded to it, the contractor
sought provisions
of all accessibility requirements to make all visually disabled persons in
support of "safe access to roads and transport facilities ... these persons was accessibility to rights and transport and
safe accessibility to movements on footpaths and accessibility to roads
and transport. The writ petition raised
existing unauthorized
road/connecting road and the alternate road/street reads as follows:
Distances L (m) W Status
(m)
ALTERNATE ROAD PROVIDED
Between Mother diary ... dustbin Harkesh Concrete
Nagar Road
ALTERNATE ROAD PROVIDED Distance 1012 7
EXISTING UNAUTHORIZED ROAD
At 500m Mother 100 6 Existing
diary Bitumin
top
At 400m
1797/2016 before this
Court seeking provision of an alternative vehicular access road. The said
petition came to be disposed of on 21st January ... already facing severe
congestion issues on its sole vehicular access road, which is also proposed to
be used for ingress and egress to the project
both concerned with the same road
referred to as 'W-12D Link Road'.
2. This road is alleged, by the plaintiffs ... Since
its inception, the primary access and connectivity lifeline
to and from Indra Enclave has been through an access
road connecting Indra Enclave, Neb Sarai
July, 2013, ordered that only minimum
land required for proper road access to the Institute of Liver
and Biliary Sciences be obtained from the land ... working out as to how much
minimum land is required for road access, the petitioners are
being sought to be dispossessed from their land, without
plotted housing, group housing, colony, availability of civic and social
infrastructure, access to roads etc.
23. It was his contention that MVCs
M/S Eros Resorts & Hotel Ltd & Ors vs Mcd on 12 September, 2025
Excavation in Powerhouse area
up to EL 531 m (average)
including access road.
Excavation, leveling and grading
works of switch yard area.
Section 8 Underground ... resulted in higher expenses.
Delay in handing over the drawings and access roads by Respondents
caused the delay. Respondent had completed more than