Tyres - 2001 (45) RLT 582 (CEGAT-Kol.), machinery - know-how and basic design documents - relating to the activities of manufacture of the goods (tyres) - their
included advice, consultancy or technical assistance, feasibility study, pre-design services, basic design engineering, detailed engineering design, procurement, construction supervision and project management, supervision ... which, it included feasibility study, pre-design study/project report, basic design engineering, detailed design engineering, trouble-shooting and technical services including establishing systems
account of excess payment of excise duty but
is basically designed to give effect to the exemption and to operationalise the
exemption given
account of excess payment of excise duty but is
basically designed to give effect to the exemption and to operationalise the exemption
given
pump attached to it, such operation would be contrary to the basic design for this model of Alternator, and as such, it became an integrated ... pump attached to it, such operation would be contrary to the basic design for this model of Alternator. It becomes an integrated unit only after
application sought information on 05 points regarding present
post/designation of Shri Ashish Saxena, basic pay and all other allowances with total
emoluments, complete details ... issues related thereto.
The CPIO, vide letter dated 27.07.2018, informed the designation, basic pay and VDA
details of Shri Ashish Saxena and for other points
following categories:
(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement.
(vi) Construction supervision & project
excess payment of excise duty by the
manufacturers, but is basically designed to give effect
to the exemption. In other words, the mechanism has
been
excess payment of excise duty by the
manufacturers, but is basically designed to give effect
to the exemption. In other words, the mechanism has
been
categories: -
"(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement.
(vi) Construction supervision & project ... following
categories: -
(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement
(vi) Construction supervision & project