expected design and having no approval even for the required basic design to
conduct operations and contained many lapses as indicated
strengthen the wall from inside
upto some height but because of basic design faults as
discussed above, the same also did not prove helpful
strengthen the wall from inside
upto some height but because of basic design faults as discussed
above, the same also did not prove helpful
Directorate of Basic Education that since Sub Deputy Inspector of Schools / Assistant Basic Education Officers and Deputy Basic Education Officers were exercising supervisory and administrative ... Deputy Inspector of Schools / Assistant Basic Education Officers and Deputy Basic Education Officers have been merged and a new designation of Block Education Officer
semiconductor devices, especially transistors, diodes
and integrated circuits. It also deals with designing
electronic circuits, devices, microprocessors,
microcontrollers and their systems. However, the field ... name implies, deals with
long range communications. The field ranges from basic
circuit design to strategic mass developments. A
-7-
Telecommunication Engineer is responsible
eligible for the post of surveillance worker,
which was re-designated as Basic Health Worker. Arrears of increment were
http://www.judis
earned several promotions , which are as under:
Promotions
Date
Designation
Scale
Basic
1st
01/07/97
Protocol Officer
Basic Health Worker held by the petitioner was converted as a
Basic Health Inspector in the same pay-scale, was in the nature ... appointed as a Malaria Inspector on 12.2.1962 which
post was re-designated as Basic Health Worker with effect from
1974 carrying the same pay-scale
Batra Hospital Employees Union vs Batra Hospital & Medical Research on 22 January, 2018
Author
expiry of the
levy. The 90 days are meant basically for the Designated Authority to assess
the data, to conclude and form a prima facie