Search Results Page

Search Results

1 - 10 of 5060 (1.48 seconds)

Oil And Natural Gas Corporation Ltd. vs Newton Engineering And Chemicals ... on 17 October, 2025

bidder was required to inter-alia carry out included : i. Process design, basic engineering, detailed engineering, manufacture, fabrication, supply, total procurement of all the Items ... Agreement between the Respondent and UEM, UEM was primarily responsible for basic design and engineering, detailed engineering, technical collaboration assistance / services, critical equipment supplies
Bombay High Court Cites 14 - Cited by 0 - R I Chagla - Full Document
1   2 3 4 5 6 7 8 9 10 Next