comprised of (i) $ 148,000.00 under the head of "Basic Design
and Engineering Package" (Referred to as BDEP) both ... assessment of the bills of entry by adding the value
of basic design and engineering package and license fee for technology.
Technology transfer in proportion
connection with CAE/CAD modeling and iterative simulation. It
receives the basic design from its group company with respect to
CAD modeling and makes ... support services of automobile parts. He
submitted that the basic designs come from the AE while the
assessee uses data base of AE located outside
other hand respondent No.4 will be engaged
15
only in basic design, vetting of details, support in
manufacturing and supervision in erection and
commissioning ... handing plant, while
respondent No.4 is required to provide only basic
design, vetting of details, support in manufacturing
and supervision in erection and commissioning
excess payment of duty by the
manufacturer/assessee but is basically designed to operationalise
exemption. He submits that unspent amount lying in Current Account
desirous applicant is supposed to include
a description of basic engineering design and risk analysis of
ropeway, schemes for safety requirements and emergency plan ... required to be supplied by intending promoter showing the
description of basic engineering design and risk analysis of
ropeway, schemes for safety requirements and emergency
unit. The activities are
project management, licence, preparation of basic design and
engineering, procurement, fabrication, inspection, erection,
installation, commissioning, performance guarantee test run etc.
Thus ... commissioning
but extends to project management, technology licensing,
preparation of basic design and engineering package as well as
detailed engineering, procurement etc. Thus, the additional
excess payment of excise duty by the
manufacturers, but is basically designed to give effect
to the exemption. In other words, the mechanism has
been
excess payment of excise duty by the
manufacturers, but is basically designed to give effect
to the exemption. In other words, the mechanism has
been
categories: -
"(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement.
(vi) Construction supervision & project ... following
categories: -
(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement
(vi) Construction supervision & project
categories: -
"(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement.
(vi) Construction supervision & project ... following
categories: -
(i) Feasibility study.
(ii) Pre-design services/project.
(iii) Basic design engineering.
(iv) Detailed design engineering.
(v) Procurement
(vi) Construction supervision & project