January 29, 2011 vide Operational Plan.
vii. Failure to complete the basic engineering drawings for
infrastructure within the stipulated timeline".
15. The notice ... delay of more than 11 months in
the execution of the Basic Engineering Drawings (submitted on
November 16, 2011) in contravention of the Work Schedule
Metallurgical and Engineering Consultants (India)
Limited ('MECON') was appointed as the technical consultant under the
contract, responsible for approving the drawings and data ... 2018 Page 4 of 139
Signing Date:04.05.2024
16:49:13
Engineering Drawings ('BEDs') would be progressively submitted upto
15.12.2007 and approvals thereof
obliged to perform, broadly, the following
activities, viz.: (i) basic and detailed engineering and drawings; (ii)
procurement and offshore supply of equipment and material ... installation stage which was
subsequent to Linde providing the basic and detailed engineering and
drawings and offshore supply of equipment and material. Thus, the income
arbitrator further found that the respondent and EIL
delayed feeding of engineering inputs to the petitioner and found the
same to be the main reason ... agreement for completion
and did not arrange for the basic engineering inputs, drawings,
standard and specification necessary for the petitioner to perform its
part
Engg.Chemistry Engg, Same
Physics/Engg.Chemistry
Basic Technical Communication -I Basic Technical Same
Communication -I
Basic Electrical Basic Technical Same
Engineering/Mechanical Engineering Engineering ... PRACTICAL LABS
Physics/Chemistry Physics/Chemistry Same
Basic Electrical Basic Electrical Same
Engineering/Mechanical Engineering Engineering/Mechanical
Engineering
Fundamental of Computer & Fundamental of Computer
following :
(a) calculation and design sheets
(b) basic design data including design manuals where available
(c) drawings
(d) process specifications
(e) material specifications
(f) performance ... test data
(h) apparatus instruction books
and similar data generally known as engineering and manufacturing information.
6. Westinghouse at its option could also supply information
against their being a plant
since they were in a sense the basic tools of the
assessee's trade having a fairly enduring utility ... assessee, namely,
the technical know-how in the shape of drawings,
designs charts, plans, processing data and other
literature falls within the definition
contract drawings and revisions
thereto. The contractor shall make a this
own expense any additional copies he
requires. One copy of the drawings furnished ... very basis of
the said argument. The providing of the drawings is
the very basic factor to be provided before any
construction can be completed
execution of Waste Water
Treatment Plant (WWTP) including process design,
basic, engg., detail engg., procurement, supply,
fabrication, erection with all civil, electrical,
instrumentation works, testing ... contractor's scope of work shall
comprise process design basic Engg. And detail
Engg. Based on the Indicative flow diagram
managerial, supervisory and administrative
nature of duties during his tenure; the primary, basic and dominant nature of
W.P.(C)9843/2018 Page ... regular reports; preparation of
sketches; preparing "Request for quotation" with drawings to call the
contractors to get quotations and then preparing comparative statement