Contract did not mandate UEM's approval/ signature
on all drawings for continuation of the work. It was urged
that ... next contended that the Tribunal wrongly
held that the submission of basic engineering drawings by the
respondent constituted less than 5% of the Contract value
said Contract i.e. delay in issuance of the basic plans and
engineering design / drawings had resulted in the Termination Notice
to complete minimal action ... there being delay in issuance of basic plans and engineering
design / drawings is entirely misplaced. The issuance of the basic
plans and engineering designs / drawings
Maharashtra State Road Development ... vs Plus Bksp Toll Ltd on 19 April, 2021
Equivalent citations
approving basic engineering package for Degaon
STP.
(J) Delay in approval of billing breakup for Degaon STP.
(K) Delay in approving general arrangement drawings
approving basic engineering package for Degaon
STP.
(J) Delay in approval of billing breakup for Degaon STP.
(K) Delay in approving general arrangement drawings
approving basic engineering package for Degaon
STP.
(J) Delay in approval of billing breakup for Degaon STP.
(K) Delay in approving general arrangement drawings
Engineering Course includes subject relating to constructions and development, for it is apparent from the ordinances and regulations relating to examinations in the Civil Engineering ... papers for construction, testing of materials, building and drawing, surveying building design and drawing, traffic engineering and control and finally, architectural town planning. These papers
Engineering Courses includes subjects relating to construction and development for it is apparent from the ordinances and regulations relating to examinations in the Civil Engineering ... papers for construction, testing of materials, building and drawing, surveying, building design and drawing traffic engineering and control and finally architectural town planning. These papers
whatsoever. In
para 9.3 onwards the defendant No.2 has given the basic
description of the equipment and process involved in Powder
Transfer System ... relying on expert books, we have arrived at the
present details, dimensions, drawings and design of
the equipment. The equipment design is optimized
then sought to draw support from the judgement of
the Hon'ble Supreme Court in the case of Ssangyong Engineering ... Arbitral Award can be set aside if the same contravenes the most basic
notions of morality and justice. He pointed out that to foist