work.
Total length of the project stretch consisting of 03 bypasses (aggregate
length of bypasses 63.81 km) is 132.913 km. In the entire project stretch ... service road provisioned are as under:
S.No. Name of Length of Length of
Bypass Bypass Service Road
(in Km)
1 Vyara
proposed to be acquired for the purpose of laying 4.7 kms length of Bypass road in five villages mentioned above is 31.97 hectares and lands ... proposed to be acquired for the purpose of laying 4.7 kms length of Bypass road in five villages mentioned above is extracted hereunder
National Highway
Highways, projects
Highways
Express >= 30 km
ways and length
bypasses
>= 30 Km
length Or
14
NHAI
15
Notifications dated 11 November
Right side of the Narasaraopeta Town i.e. towards
Guntur side. Length of bypass proposed is 20.00 Km. In which
existing 5.300Km falls ... alignment on Left side of
Narasaraopeta Town je towards Vinukonda side. Length of bypass
proposed is 22.570 Km. Which is entirely Green field Highway
Right side of the Narasaraopeta Town i.e. towards
Guntur side. Length of bypass proposed is 20.00 Km. In which
existing 5.300Km falls ... alignment on Left side of
Narasaraopeta Town je towards Vinukonda side. Length of bypass
proposed is 22.570 Km. Which is entirely Green field Highway
Right side of the Narasaraopeta Town i.e. towards
Guntur side. Length of bypass proposed is 20.00 Km. In which
existing 5.300Km falls ... alignment on Left side of
Narasaraopeta Town je towards Vinukonda side. Length of bypass
proposed is 22.570 Km. Which is entirely Green field Highway
Right side of the Narasaraopeta Town i.e. towards
Guntur side. Length of bypass proposed is 20.00 Km. In which
existing 5.300Km falls ... alignment on Left side of
Narasaraopeta Town je towards Vinukonda side. Length of bypass
proposed is 22.570 Km. Which is entirely Green field Highway
Right side of the Narasaraopeta Town i.e. towards
Guntur side. Length of bypass proposed is 20.00 Km. In which
existing 5.300Km falls ... alignment on Left side of
Narasaraopeta Town je towards Vinukonda side. Length of bypass
proposed is 22.570 Km. Which is entirely Green field Highway
Khedut Hit Rakshak Samiti & 134 vs National Highway Authority Of India & ... on 10
near Aliyur village)
vi. This project alignment includes bypass for a
length of 16.35 km and the alignment has been proposed
along the existing NH45A ... located only in the existing NH not in the bypass alignment.
The total length of the project is about 29 km in which the
bypass