secondary winding of
current transformers in the by tampering CT-PT meter of HT
service connection of M/s.Kanaga Durga Castings ... energy by tampering the metering (CT-PT) and thereby
committed energy theft by causing wrongful loss to the total
tune
respondent not
having followed the procedure for installing a CT/PT
meter, is the contention of the Board. The Board,
hence, levied penal charges ... production of the
CT/PT unit. The 3rd respondent was informed of the
need for production of the CT/PT unit only
CT/PT secondary box. In Annexure R/2, a
healthy CT/PT box is shown and below it, the tampered CT/PT box in
question ... examined in relation to meter box (outer and inner), MD Knob, Meter
Terminal Box, TTB and Meter Body. The CT/PT box is also called
Gridco Sub-station is not at all possible. In case the CT/PT metering unit at the ground level is interfered with, the consumption ... salient feature of metering equipments it is stated as under:
"(i) The metering equipments consist of CT and PT units. For LT meters
admitted position that the
appellant did not produce (CT/PT) Meter, which was
calibrated and tested before the Assistant Engineer,
eventhough test reports were produced ... first respondent has not sought for the
(CT/PT) Meter from the appellant herein and so the meter
same in the report before sealing
and taking the meter/seals/metering equipments
for testing in M&T lab as per clause ... above purpose
shall be SE 'OP' for the CT/PT meters and XEN
'OP' for Whole Current Meter.
The consumer
monthly meter reading with CMRI,
processing of data for billing in
common/required format & complete
analysis of 1/3rd meter data every
month including ... consumption
pattern of various categories of
consumers with LT CT and HT CT-PT
meters so that the data analysis of
complete meters are carried
taken to rectify the fault. Ultimately, the CT/PT unit installed in the
meter room at the telephone exchange was damaged due to the faulty ... energy from the date CT/PT meter was installed on 17.10.2002 and has
to pay from that date only and not from the date
called upon
the Appellant to augment CT/PT or upgrade metering system. The
Appellant's Unit I is availing open access to the tune ... tune of
3.42 MW since May 2016 without any metering or CT/PT
constraints and therefore, it is clear that there is no such constraint
current. There was no
contribution through one phase of the meter and the CT/PT had been
sealed and packed in the presence ... hand, the contention by the Electricity Corporation was that the
meter and CT/PT unit was not one unit. Every meter has current coil