internal mechanism of the metering equipment and some collateral evidence is found to support the conclusion that the meter has been caused to record less ... meter to stop or run slow (such as reversing the polarity of one phase of poly phase meters, changes in CT or PT
internal mechanism of the metering equipment and some collateral evidence is found to support the conclusion that the meter has been caused to record less ... meter to stop or run slow (such as reversing the polarity of one phase of poly phase meters, changes in CT or PT
internal mechanism of the metering equipment and some
collateral evidence is found to support the conclusion that the
meter has been caused to record less ... meter to stop or run slow
(such as reversing the polarity of one phase of poly phase
meters, changes in CT or PT
under:
19. Testing of meters.- (i) The licensee shall conduct periodical inspection/testing and calibration of the meters as per Rule 57 of Electricity Rules ... supply meters (HT) 1 year
LT meters (11kW-100kW) 3 years
LT meters (up to 11 kW) 6 years
Wherever applicable, CT and PT shall
Meter Testing department. The Meter Testing department found the following pilferage showing theft of electricity by the petitioner.
"a) One seal of CT/PT ... after removing the seals of the CT/PT terminal covers it was also observed by the team that meter was recording 5- per cent less
following
manner:-
(a) Periodicity of meter tests
The licensee shall observe following time schedule for regular meter testing:-
CS(OS) No.1192/2006 Page ... meters (HT) 1 year
LT meters (11 kW-100 kW) 3 years
LT meters (upto 11 kW) 6 years
Wherever applicable, CT and PT shall
internal mechanism of the metering
equipment and some collateral evidence is found to
support the conclusion that the meter has been caused to
record less ... meter to stop or run slow (such as reversing
the polarity of one phase of poly phase meters, changes
in CT or PT
Electricity Regulatory Commission
(Performance Standards-Metering & Billing) Regulations, 2002. They read
as under:-
"19. Testing of meters
(i) The licensee shall conduct periodical ... supply meters (HT) 1 year
LT meters (11kW-100 kW) 3 years
LT meters (upto11 kW) 6 years.
Wherever applicable, CT and PT shall also
CT wires or CT/PT terminal block pins
and it is not possible for the consumer to have access to the said CT wires ... reports dated 19.06.2010 and 23.06.2010, all the seals of the
meter, meter box and meter terminals were found intact and the
respondent in order
Village Metering Equipments 265V/33KV
Jatisara, installed of Delivery 1x100KVA, 433V/33KV
Tehsil - Point Sr.No.
Phalodi, S.No. of 33 KV CT ... SKEFM2400C
Meter: SKEFM2400F,
11071567 SKEFM2400G,
Metering Equipments SKEFM2400M,
installed of SPD SKEFM2400P,
premises (Standby SKEFM2400Q,
Meters) SKEFM13007,
S.No. of 33 KV CT