arise. This resulted in the
work of erection of 220 kV Double Circuit Line for connectivity of east to
west 220 kV sub-station being ... Expenses as controllable factor.
5.4 The Appellant has claimed that the project of double circuit line for
connectivity of East to West through
Appellant's power project.
According to the Respondents 2 and 3 the capital cost of the project
had doubled and making the power highly
Adani Gas Limited vs Petroleum & Natural Gas Regulatory ... on 28 February, 2019
Judgment of
Project Developers. It is inconceivable that the Project
Developers will get as reimbursement all taxes at the rate of tax
without the Project Developers actually ... annual de-gradation would result in un-intended
double benefit to the Solar Project Developers.
4.34 As mentioned above the capacity utilisation factor allowed
Commercial Operation
Date ("COD") of the first two units of project shall be
achieved within the 19 months of the date of achieving ... double circuit line for
evacuation of power from the 20 MW project was ready
for charging. On 2.4.2003, the CoD of the project was
declared
Allain Duhangan Hydro
Electric Project. The clearance included cost of 220 kV
Allain Duhangan - Nalagarh double circuit line for
evacuation of power from the Appellant ... Nalagarh 220 kV double circuit line of the
Appellant on providing interconnection to the dedicated
transmission system of Malana-II Hydro Project of the
Respondent
Vidarbha Industries Power Limited vs The Maharashtra Electricity ... on 3 November, 2016
Appeal No 187
Roha Dyechem Private Limited vs Maharashtra Electricity Regulatory ... on 27 April, 2021
IN THE APPELLATE
crores actually incurred during
2008-09. Thus, the projected A&G expenses were almost
double of the actual incurred during 2008-09. Thus, rise ... State Commission
shall consider the same to examine if there has been double
accounting of the Government subsidy of Rs. 54 crores
system planned for evacuation of power from
Bhilalngana III Project constituted of a 220 kV Double Circuit
Line from Bhilangana to proposed 220kV pooling substation ... also indicated to PTCUL that
Bhilangana II project which is downstream of the
Bhilangana III project is expected to be in the range