assigning the reason that
the project would suffer double jeopardy of the increased project
cost and corresponding reduction in the Govt. equity, which may cast ... enhance the price of
the land stating that the project would suffer double jeopardy of
increased project cost and due to reduced Government equity
applicant joined
respondent no.1 in one of its research project „Double Blind
Novalgin (NI-209)‟ on 01.01.1997. On 04.03.1999 the applicant
was appointed
deals with cases of construction of New Lines, Gauge Conversion and Doubling
projects in 3 major Railway Zones i.e. Central Railway, Northeast Frontier
Railway
execute, complete, operate and maintain all the power
stations and the power projects of the State. For its day to
day functioning, earlier the respondent ... would be conducted
and the Consultants implementing the Project as well as
Project Management Consultants for Double Entry Project,
had recommended that the said accounts
Second Tunnel with
9.2 M internal diameter for Pula Subbaiah Veligonda Project using Double
Shield Tunnel Boring Machine i.e. from Kollam Vagu in foreshore ... 2012, dated 20.07.2012,
the State Government accorded permission to the Chief Engineer (Projects),
Ongole/Second respondent herein to extend time up to 30.06.2014 and
subsequently
Second Tunnel with
9.2 M internal diameter for Pula Subbaiah Veligonda Project using Double
Shield Tunnel Boring Machine i.e. from Kollam Vagu in foreshore ... 2012, dated 20.07.2012,
the State Government accorded permission to the Chief Engineer (Projects),
Ongole/Second respondent herein to extend time up to 30.06.2014 and
subsequently
Second Tunnel with
9.2 M internal diameter for Pula Subbaiah Veligonda Project using Double
Shield Tunnel Boring Machine i.e. from Kollam Vagu in foreshore ... 2012, dated 20.07.2012,
the State Government accorded permission to the Chief Engineer (Projects),
Ongole/Second respondent herein to extend time up to 30.06.2014 and
subsequently
Appellant's power project.
According to the Respondents 2 and 3 the capital cost of the project
had doubled and making the power highly
Prime Minister stating the
determination of the country to double the projected income of the farmers by the
year 2022.
The rest of the replies
housing plan was envisaged for the
construction of real estate projects in two locations of the land acquired: 1,162
acres in Wish Town, NOIDA ... sought to assure that it would double the strength of existing workers
for the construction of its projects. JAL has also stated that it would