samples and forwarded the same for testing to M/s. Electronics Regional Test Laboratory (East), Standardization Testing and Quality Certificate Directorate, Government of India, Kolkata ... testing of the samples and in case, the Tribunal so desires, the samples should be got re-tested from M/s. Centre for Electronics Test
with built-in battery back-up. The test report of Electronics Test and Development Centre, Department of Electronics, dated 15.9.98 produced before the adjudicating authority ... certificate issued by the Senior Technical Officer and test report of Electronics Test and Development Centre showed that the batteries under import were materials required
manufacturer etc. They have also relied upon a test report from Electronic Test and Development Center, Peenya, Bangalore which reported that the equipment was basically ... particular, they had asked for cross-examining the expert from Electronic Test and Development Center, Peenya, Bangalore and they also wanted an opportunity for demonstrating
Indo-Asian Fusegear Ltd, Noida and report of Electronics Regional Test Laboratory (West), Ministry of Communication and Information Technology, Mumbai. It is submitted that ... submitted that the Electronic Regional Test Laboratory, which tested the second sample, is a Governmental agency competent to test electronic goods like CFLs
upheld by the Tribunal as the impugned cables in that case were tested and the same withstood 250V for 5 hrs. without any damage ... correct as the department had obtained a report from the Electronics Test and Development Centre, Jaipur under the Directorate of Information Technology, Government of India
mization,integratio
n and testing
b. B. IMS client
integration
1. Samsung Exhibit A-(Page c. C. Protocol Testing
Electronics, No.38) Clause 1-
India ... Camcorder applications, Integrate and test OCL components
with TJ's Codecs and other DSP/IVA Socket Nodes, Integrate and
test OCL, library, and components
right from 2012
onwards. Their earlier consignment was duly tested by Electronics
Regional Test Laboratory (EAST) and Test Report was issued by them ... drawn from the imported
consignment and the same was sent for testing to
Electronics Regional Test Laboratory (EAST). After testing
the same, the Laboratory
right from 2012
onwards. Their earlier consignment was duly tested by Electronics
Regional Test Laboratory (EAST) and Test Report was issued by them ... drawn from the imported
consignment and the same was sent for testing to
Electronics Regional Test Laboratory (EAST). After testing
the same, the Laboratory
letter of protest to the Department. The goods were subsequently got
tested from Electronic Regional Test Laboratory (ERTL) whereupon the
Department concluded that the subject
Reports of the two models of the imported iRETS
from the Electronics Regional Test Laboratory of the
Ministry of Communication and Information
Technology, Government ... less than 5 amperes.
(e) The test report of the Electronics Regional Testing
Laboratory of the Ministry of Communications cannot be
used as an evidence