Hard rock, construction of Pucca side drain, unlined surface drain and
providing GSB in stretches etc. from 11 th to 15th Km) under NLCPR ... Hard rock,
construction of Pucca side drain, unlined surface drain and providing GSB
in stretches etc. from 11th to 15th Km" for an estimated
Repairs) to
damage stretches by
Metalling, Surfacing work
and Hard Shoulder with
GSB from 1st KM to 8th KM
and 9th KM to 12th
Repairs) to
damage stretches by
Metalling, Surfacing work
and Hard Shoulder with
GSB from 1st KM to 8th KM
and 9th KM to 12th
Repairs) to
damage stretches by
Metalling, Surfacing work
and Hard Shoulder with
GSB from 1st KM to 8th KM
and 9th KM to 12th
Repairs) to
damage stretches by
Metalling, Surfacing work
and Hard Shoulder with
GSB from 1st KM to 8th KM
and 9th KM to 12th
Repairs) to
damage stretches by
Metalling, Surfacing work
and Hard Shoulder with
GSB from 1st KM to 8th KM
and 9th KM to 12th
been
made by the respondent No.3:- "The extra work of GSB and WBM Grade II
from Ch. 15550.00 m to Ch.18150
been
made by the respondent No.3:- "The extra work of GSB and WBM Grade II
from Ch. 15550.00 m to Ch.18150
Dotma in connection with Serfanguri-
Fakiragram PWD road to Trumline with GSB at Bonshi Bosti under SOPD funds BTC for the
year
Nani Bagan] to Swarighat village by providing E/W in embankment, SC, GSB and
RCC Box culvet under BTC for the year