dated 16.01.2021
issued by the respondent for the "Gauge Conversion of
Becharaji (63.83 KM) - Ranuj (101.983 KM) Section, Total
length of 38.153 KM Metre ... dated
16.01.2021 issued by the respondent for the "Gauge
Conversion of Becharaji (63.83 KM) - Ranuj (101.983 KM)
Section, Total length of 38.153 KM Metre
dated 16.01.2021
issued by the respondent for the "Gauge Conversion of
Becharaji (63.83 KM) - Ranuj (101.983 KM) Section, Total
length of 38.153 KM Metre ... dated
16.01.2021 issued by the respondent for the "Gauge
Conversion of Becharaji (63.83 KM) - Ranuj (101.983 KM)
Section, Total length of 38.153 KM Metre
Divisional Railway Manager,
Southern Railway,
Trichy.
4. The Deputy Chief Engineer,
Gauge Conversion/II,
Southern Railway,
Tiruchirappalli.
5. The District Collector,
Nagapattinam District,
Nagapattinam. ... Respondents ... judis
Page 2 of 6
W.P.No.9630 of 2019
gauge conversion work between Thiruvarur and Mayiladuthurai Railway
Station, under the urgency provision
Southern Railway,
Egmore, Chennai - 600 008.
3.The Deputy Chief Engineer,
Gauge conversion II,
Southern Railway,
Tiruchirapalli. ...Respondents
PRAYER : Writ Petition filed Under Article ... issued by the
1st respondent on 13.06.2014 for the proposed Gauge conversion of work
between Pattukottai-Karaikudi Section, proposed construction of Station
building, platforms, approach
6767/2021 ORDER
the "Gauge Conversion of Bechraji
(63.83KM)-Ranuj ( 101.983 KM )
Section, Total length of 38.153KM Metre
Gauge to Broad Gauge ... dated
16.01.2021 issued by the Respondent for
the "Gauge Conversion of Bechraji (63.83
KM)- Ranuj (101.983 KM) Section, Total
length of 38.153 KM Metre
Interlocking at 21 stations in connection with MG (Meter Gauge) to
BG (Broad Gauge) Gauge Conversion on Samdari - Bhildi (223.44
Km) of North Western Railway ... Interlocking at 21 stations in connection with MG (Meter Gauge)
to BG (Broad Gauge) Gauge Conversion on Samdari - Bhildi (223.44
Km) of North Western Railway
taken by the Railway Board to eliminate all unmanned level
crossing and conversion into manned level crossing depending upon the
Traffic Vehicle Unit or construction ... manned level
crossing shall be permitted in new line and gauge conversion projects.
Formation of second line between Vanchi Maniyachi to Nagercoil via
Tirunelveli
Divisional Officer,
Thiruvannamalai,
Thiruvannamalai District.
3. The Deputy Chief Engineer,
Constructions,
Gauge Conversion-Katpadi-Villupuram,
Southern Railway,
Tamabaram, Chennai. ... Respondents
PRAYER : Writ Petition filed under ... Divisional Officer,
Thiruvannamalai,
Thiruvannamalai District.
3. The Deputy Chief Engineer,
Constructions,
Gauge Conversion-Katpadi-Villupuram,
Southern Railway,
Tamabaram, Chennai
awarded the execution of earth work in connection
with the gauge conversion of railway line between Quilon and
Tenkasi.
5. The prosecution case, in short
taken by the Railway Board to eliminate all unmanned level
crossing and conversion into manned level crossing depending upon the
Traffic Vehicle Unit or construction ... manned level
crossing shall be permitted in new line and gauge conversion projects.
Formation of second line between Vanchi Maniyachi to Nagercoil via
Tirunelveli