consequently direct the respondents to grant time for
opening the layout roads for public access taking into the consideration of
the threatening situation which prevails ... reminder letter dated 30.06.2024 seeking further
time to open the layout roads for public access.
2. Heard the learned counsel appearing on either side
consequently direct the respondents to grant time for
opening the layout roads for public access taking into the consideration of
the threatening situation which prevails ... reminder letter dated 30.06.2024 seeking further
time to open the layout roads for public access.
2. Heard the learned counsel appearing on either side
internal roads. For easy access to various buildings, a long 12
meter wide internal road is sanctioned in the said layout plan which
connects ... meters wide road has been approved by MCGM. The said 12M wide
road is giving access to buildings/ societies in the layout viz. (i)
Riddhi
internal roads. For easy access to various buildings, a long 12
meter wide internal road is sanctioned in the said layout plan which
connects ... meters wide road has been approved by MCGM. The said 12M wide
road is giving access to buildings/ societies in the layout viz. (i)
Riddhi
feet (60 ft.) wide road was to enable the
petitioners to use it as an access road for the layouts which they
propose to develop ... road as an access road without
providing for a different access road would have some bearing on
whether or not the layout permission ought
Originally, the 5th respondent/ Society (hereinafter referred to as
Society) by forming Layout in SurveyNo.155, 170, 171, 178 and 179
(petitioner's survey ... society members, the society, in
order to lay approach road access from their layout to Trichy Main Road
approached the adjacent land owners of their
Annexure-F and G, the access from the main road
i.e from Bagalkot-Badami road to R.S.No.21 is completely ... meters wide road is
formed to have an access to the layout from the main
road
Kurumbapet Revenue Village, claiming that the access road shown to the
layout is a private road. It was referred before the 7th respondent herein ... Villianur Commune Panchayat. The road is also
free from any obstruction and having free access to the proposed layout
MRS Nagar
Division Bench had examined access to a
road in an unapproved layout. The Division Bench had held as follows
in paragraph No. 20:-
“20.Whether ... judis
10
an unapproved layout and the road is also categorised as an
unapproved road or a private road, access to the same cannot
road to facilitate access to the Rose Valley
layout, while applying for the layout approval.
5. Initially, the said layout was not approved and
subsequently ... obtained
patta. That apart, except the said road, there is no other access to Rose
Valley layout. That apart, it is also evident that