Search Results Page

Search Results

1 - 10 of 80 (0.12 seconds)

Chennamangathihalli Solar Power ... vs Bangalore Electricity Supply Company ... on 14 September, 2020

Inspector for charging of the line and for safety and security issues connected with the generating station and line connectivity, installation of metering arrangement, synchronization ... delay in the DC issuing orders for land conversion, delay in according approval for evacuation line etc., as a result of which it was unable
Appellate Tribunal For Electricity Cites 37 - Cited by 8 - Full Document

Hunsankodilli Solar Power Project Ll.P ... vs Bangalore Electricity Supply Company ... on 12 August, 2021

implementation of the project. These include principally, the following: (a) Approval for conversion of the land from agricultural purpose to be used for setting ... Inspector for charging of the line and for safety and security issues connected with the generating station and line connectivity, installation of metering arrangement, synchronization
Appellate Tribunal For Electricity Cites 39 - Cited by 1 - Full Document

Madamageri Solar Power Project Ll.P. & ... vs Hubli Electricity Supply Company ... on 12 August, 2021

Inspector for charging of the line and for safety and security issues connected with the generating station and line connectivity, installation of metering arrangement, synchronization ... transmission line Appeal 2 Application for evacuation of 30.06.2015 20.10.2015 3 and half Para 7 (O) power months Of Appeal 3 Application for conversion
Appellate Tribunal For Electricity Cites 32 - Cited by 1 - Full Document
1   2 3 4 5 6 7 8 Next