with Northern Frontier Railway (Construction Organization)
for construction of new rail lines and conversion of M.G. Lines to B.G.
Lines by using Mobile ... 75888 of 2023
certified that the appellant constructed new railway lines/ gauge
conversion of MG Lines to BG Lines, an extension work of North
Frontier
conversion
into PP fabrics, liners, plain film flexible and HDPE linings. On
conversion, they have received certain quantity of finished goods
but major quantity
reception, conversion and transmission of data. He has submitted
that prior to 2007, the heading 85.17 covers only apparatus for line
telephony ... including telephones
for cellular networks or for other
wireless networks:
8517 11 -- Line telephone sets with cordless u Free -
handsets:
8517 11 10 --- Push button
reception, conversion and transmission of data. He has submitted
that prior to 2007, the heading 85.17 covers only apparatus for line
telephony ... including telephones
for cellular networks or for other
wireless networks:
8517 11 -- Line telephone sets with cordless u Free -
handsets:
8517 11 10 --- Push button
SMPS provides the 12V DC power after
conversion of the alternating current (AC) from the main power line
to direct current (DC) and also ... effectively operated without SMPS
providing regulated supply either directly from the main line or
through internal battery back-up during power cuts. Thus
processing, compacting, heating, curing and grinding
are essential in conversion of these materials into Brake Lining or Friction
Pad. Further Rule 3(a) mandates
held by various judicial forums,
including Tribunals and High Courts, that the
conversion of a shipping bill under the duty
drawback scheme to one under ... appellant submits that the rejection of the
conversion request in the present case is not in line
with the consistent legal position and hence
CBIC Circular No.36/2010 dated 23.09.2010
allowed conversion of these shipping bills from NFEI 99 to EOU /
EPZ / SEZ / EHTP ... Principal Commissioner clearly specifies the
time line of three months and hence, the request for conversion
filed beyond three months cannot be accepted
concluding that the residuary, and non-specific, tariff line below
'Machines for the reception, conversion and transmission or
regeneration of voice, images or other
line materials, testing
and commissioning of 33/11 KV lines for new sub-stations, revamping 33/11 KV
sub-station, replacing and conversion of existing