says :-
''Having decided to go in for an in-line printing conversion equipment with its all round superiority over conventional sheet-fed equipment ... says -
"Having decided to go in for an in-line printing conversion equipment which its all round superiority over conventional sheet-fed equipment finally
railway infrastructure projects assigned by MoR includes
doubling (3rd/4th lines) gauge conversion, new lines railway electrification
and major bridges.
4. It is relevant
Inspector for charging
of the line and for safety and security issues connected with the
generating station and line connectivity, installation of metering
arrangement, synchronization ... delay in the DC issuing orders for land conversion, delay in
according approval for evacuation line etc., as a result of which it
was unable
Conversion of 3 direct lines into Jn. lines @ 100 300-00
---------
(Rs. Nine thousand two hundred & fifty only) 9,250-00
---------
Therefore ... amounts were representing annual rent payable, installation charges and conversion of direct lines into junction lines. In our opinion all these items represent only revenue
appellant. In fact it was a project
for gauge conversion of existing railway line and a bridge was to be
constructed on river Narmada ... fact it was a project for gauge conversion of existing railway line
and a bridge was to be constructed on the river. The project
entity shall not be allowed to apply to the
Board for conversion of its dedicated pipeline into a natural gas
pipeline for a period ... Board may decide to authorize the
entity for such conversion in line with the procedure under clause
(d) of sub-regulation (1) and the moratorium
nature of the line to be
laid down namely 220 KV line instead of 400 KV DC line to
Varsana sub station. The delay ... terms and conditions for allowing the above
namely conversion of the dedicated line from 400 KV DC line to
220 KV line from Bhadreshwar
deemed to have always included
transmission by satellite (including up-lining, amplification, conversion for
down-linking of any signal), cable, optic fibre
deemed to have always
included transmission by satellite (including up-lining, amplification,
conversion for down-linking of any signal), cable, optic fibre
conversion course from diesel to electrical on 03.12.1990 and joined their working post on 04.12.1990. The respondents contend that the applicants were sent for line ... mentioned that after the initial 3 months conversion course, the applicants would need to undergo further line training/experience followed by a selection only after