respondent, Commissioner of Police,
Coimbatore on 11.03.2017, for seeking conversion to general line as per the
chief office circular dated 01.09.1980. The petitioner states that ... Home (Pol IX) Department, several persons have got conversion from TSP/AR to
general line. The Superintendent of Police, Vellore in his proceeding
claimed by the petitioner. TANGEDCO has carried
out the conversion of Over Head line into Under Ground Cable
System at Plot No.5 to avoid ... space. If the petitioner comes forward to
take up the conversion of Overhead line into Under Ground
Cable system at the specified location under Deposit
more of the capacity of the feeder line.
(d) The cost of the existing feeder line including equipments and bay etc., has to be collected ... category who opts for conversion of dedicated feeder. However TANGEDCO reserves every right to use the supply line and its equipments for supply to other
S.Vijayashankar vs The State Of Tamil Nadu on 4 September, 2019
Equivalent citations: AIRONLINE
time to time.
(a) Application Registration charge at the appropriate rates for conversion of a service from L.T. to H.T. and vice versa ... vehicle or any accident under Deposit Contribution Works (DCW).
(f) Shifting of line and deviation of line under Deposit Contribution Works.
(g) Application for temporary
Inspection also revealed that there is
no HT or LT power supply lines running through the subject land.
Further, District Collector, Salem District / first respondent ... judis.nic.in
5
6. Thus, after going through the procedure for conversion of
land, fixed Rs.1,60,800/- per acre, as the value
granted for such conversion as per Rule 102(4) of KMB
Rules and you have also sought for regularization of the
conversion work hitherto made ... available. 1.7
meter is required from the boundary line to the building. Hence
the set back for a three storied building is not available
Development Zone to an extent of 100
metres from the High Tide Line. It was, therefore, opined that feasibility of
such hotel construction ... mandatory and the respondents were asked to proceed with
reclamation/conversion or construction, only after obtaining the clearance.
Cont. Case (C) No.422/2019
R.Sridharan vs The Presiding Officer on 18 August, 2008
Author: S. Manikumar
Bench: S
T.M.Prakash vs The District Collector on 27 September, 2013
Author: S. Manikumar
Bench