poles should be replaced by lengthier ones for conversion and the single phase two wire lines should be converted as three wire HT lines with ... simple case of conversion of single phase line into a three phase line. The conversion does not involve the erection of transformer or replacement
respondent, Commissioner of Police,
Coimbatore on 11.03.2017, for seeking conversion to general line as per the
chief office circular dated 01.09.1980. The petitioner states that ... Home (Pol IX) Department, several persons have got conversion from TSP/AR to
general line. The Superintendent of Police, Vellore in his proceeding
taken by the Railway Board to eliminate all unmanned level
crossing and conversion into manned level crossing depending upon the
Traffic Vehicle Unit or construction ... manned level
crossing shall be permitted in new line and gauge conversion projects.
Formation of second line between Vanchi Maniyachi to Nagercoil via
Tirunelveli
temporary staff do not apply to casual labour.
a. Casual Labour (Open Line):
Casual Labour are primarily engaged to supplement the regular staff in work ... engaged on Railway for execution of railway projects, such as new lines, doubling, conversion, construction of building, track renewals, route relay interlocking, railway electrification, setting
Special Tahsildar,
Land Acquisition,
Broad-gauge Railway Line,
Madurantakam.
2.The Deputy Chief Engineer,
Southern Railway,
Gauge Conversion,
Chetpet, Chennai 600 031. ..Respondents/Respondents ... judis ( Uploaded on: 02/07/2025 07:43:55 pm )
Line, while conversion of the gauge between Chengalpattu and Arakkonam.
It was a linear acquisition
Special Tahsildar,
Land Acquisition,
Broad-gauge Railway Line,
Madurantakam.
2.The Deputy Chief Engineer,
Southern Railway,
Gauge Conversion,
Chetpet, Chennai 600 031. ..Respondents/Respondents ... Konerikuppam village was acquired for formation of Broad Gauge Railway
Line, while conversion of the gauge between Chengalpattu and Arakkonam.
It was a linear acquisition
Special Tahsildar,
Land Acquisition,
Broad-gauge Railway Line,
Madurantakam.
2.The Deputy Chief Engineer,
Southern Railway,
Gauge Conversion,
Chetpet, Chennai 600 031. ..Respondents/Respondents ... Konerikuppam village was acquired for formation of Broad Gauge Railway
Line, while conversion of the gauge between Chengalpattu and Arakkonam
Special Tahsildar,
Land Acquisition,
Broad-gauge Railway Line,
Madurantakam.
2.The Deputy Chief Engineer,
Southern Railway,
Gauge Conversion,
Chetpet, Chennai 600 031. ..Respondents/Respondents
Appeal ... Konerikuppam village was acquired for formation of Broad Gauge Railway
Line, while conversion of the gauge between Chengalpattu and Arakkonam.
It was a linear acquisition
Special Tahsildar,
Land Acquisition,
Broad-gauge Railway Line,
Madurantakam.
2.The Deputy Chief Engineer,
Southern Railway,
Gauge Conversion,
Chetpet, Chennai 600 031. ..Respondents/Respondents
Appeal ... Konerikuppam village was acquired for formation of Broad Gauge Railway
Line, while conversion of the gauge between Chengalpattu and Arakkonam.
It was a linear acquisition
Special Tahsildar,
Land Acquisition,
Broad-gauge Railway Line,
Madurantakam.
2.The Deputy Chief Engineer,
Southern Railway,
Gauge Conversion,
Chetpet, Chennai 600 031. ..Respondents/Respondents
Appeal ... Konerikuppam village was acquired for formation of Broad Gauge Railway
Line, while conversion of the gauge between Chengalpattu and Arakkonam.
It was a linear acquisition