2013 and also to take
action against the Regional Officer of MPPCB, Sagar, who has filed false report.
The contention raised in the said application ... affidavit filed by one of the
officer namely the Regional Officer of MPPCB Mr.A.K. Mishra, dated
23.07.2011, who is stated
2013 and also to take
action against the Regional Officer of MPPCB, Sagar, who has filed false report.
The contention raised in the said application ... affidavit filed by one of the
officer namely the Regional Officer of MPPCB Mr.A.K. Mishra, dated
23.07.2011, who is stated
monitoring system is also installed. The server connectivity shall be
provided to MPPCB on ETP commissioning.
Observations on the discharge in non-perennial drain ... unit was not operational
as in compliance of MPPCB closure direction u/s 33A of Water (P& CP)
Act 1974 dated 19.01.2022; the Madhya
also submit
periodical reports to the Madhya Pradesh State Pollution Control Board
(MPPCB). The Respondent No. 5 filed copies of documents at Annexure ... they forfeited their right to file reply.
14. The Respondent No. 2 MPPCB after inspecting the site on 31st August,
2013 submitted reply dated
verifying the monitoring compliance by the CBWTF, the
Technical Section of the MPPCB had referred the matter to the ERC
Officer of the board ... RESPONDENT mention that on the day of
second inspection by the
MPPCB there was a
technical fault in the
Hydraulic Compression
motor of the Mechanical
verifying the monitoring compliance by the CBWTF, the
Technical Section of the MPPCB had referred the matter to the ERC
Officer of the board ... RESPONDENT mention that on the day of
second inspection by the
MPPCB there was a
technical fault in the
Hydraulic Compression
motor of the Mechanical
verifying the monitoring compliance by the CBWTF, the
Technical Section of the MPPCB had referred the matter to the ERC
Officer of the board ... RESPONDENT mention that on the day of
second inspection by the
MPPCB there was a
technical fault in the
Hydraulic Compression
motor of the Mechanical
verifying the monitoring compliance by the CBWTF, the
Technical Section of the MPPCB had referred the matter to the ERC
Officer of the board ... RESPONDENT mention that on the day of
second inspection by the
MPPCB there was a
technical fault in the
Hydraulic Compression
motor of the Mechanical
Urvashi Mishra, Advocates
COUNSELS FOR RESPONDENT(S):
Ms. Parul Bhadauria, Advocate for MPPCB and MP SEIAA
Mr. Vivek Dalal, Advocate for R-3
Mr. Anurag ... Harne, Advocate for State of Madhya Pradesh
Mr. Abhay Saraf, RO, MPPCB, Mandideep
Mr. R P Kamlesh, Mining Officer, Harda
CORAM
Verma, Advocate for State of M.P.
Ms. Parul Bhadoria, Advocate for MPPCB
Mr. Yadvendra Yadav, Advocate for CPC B
Mr. Qasim Ali, Advocate ... Brajesh Sharma, RO, MPPCB
CORAM:
HON'BLE MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER
HON'BLE DR. AFROZ AHMAD, EXPERT MEMBER
Reserved on: July