Search Results Page

Search Results

1 - 10 of 71997 (6.09 seconds)

Section 2 in The Electricity Act, 2003 [Entire Act]

Official Gazette and the expression “notify” shall be construed accordingly; (47) “open access” means the non-discriminatory provision for the use of transmission lines ... electric line which is placed above the ground and in the open air but does not include live rails of a traction system; (49) “person
Union of India - Section Cites 0 - Cited by 1189

Section 42 in The Electricity Act, 2003 [Entire Act]

Electricity Act, 2003 42. Duties of distribution licensee and open access.– (1) It shall be the duty of a distribution licensee to develop and maintain ... provisions contained in this Act. (2) The State Commission shall introduce open access in such phases and subject to such conditions, (including the cross subsidies
Union of India - Section Cites 0 - Cited by 1042

Section 39 in The Electricity Act, 2003 [Entire Act]

generating station to the load centres; (d) to provide non-discriminatory open access to its transmission system for use by– (i) any licensee or generating ... transmission charges; or (ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of section
Union of India - Section Cites 0 - Cited by 643

Section 38 in The Electricity Act, 2003 [Entire Act]

generating stations to the load centres; (d) to provide non-discriminatory open access to its transmission system for use by– (i) any licensee or generating ... transmission charges; or (ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of section
Union of India - Section Cites 0 - Cited by 329

Section 9 in The Electricity Act, 2003 [Entire Act]

maintains and operates such plant, shall have the right to open access for the purposes of carrying electricity from his captive generating plant ... destination of his use: Provided that such open access shall be subject to availability of adequate transmission facility and such availability of transmission facility shall
Union of India - Section Cites 0 - Cited by 464

Section 40 in The Electricity Act, 2003 [Entire Act]

Centre as the case may be; (c) to provide non-discriminatory open access to its transmission system for use by– (i) any licensee or generating ... transmission charges; or (ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of section
Union of India - Section Cites 0 - Cited by 498

Hindustan Zinc Limited (H.Z.L.) vs Ajmer Vidyut Vitran Nigam Limited on 4 December, 2019

synchronized with the Rajasthan Vidyut Prasarran Nigam Limited Grid. Short term open access to transmission and distribution systems of this Grid was sought under ... requisite permission was obtained. Thereafter, the appellant entered into three open access agreements with the respondent on 10.03.2005 for wheeling of power from its captive
Supreme Court - Daily Orders Cites 15 - Cited by 98 - R F Nariman - Full Document
1   2 3 4 5 6 7 8 9 10 Next