feasible to construct a Road Over Bridge (hereinafter referred
to as 'ROB') or a Road Under Bridge (hereinafter referred ... construction of a Road Over Bridge (hereinafter referred to as 'ROB') or
Road Under Bridge (hereinafter referred to as ?RUB?) in lieu
William Scott in 'THE YONGE KLASSINA', (1804) 5 Ch. Rob. 302-3 a man may have mercantile concerns in two countries ... will not be decisive. See also The Portland' (1800) 3 Ch. Rob. 41." From this passage it is evident that the term
kept above the driver's seat in the cabin and robbed Rs.20,000/- and all the accused ran away from the place ... rupee notes , twenty 50 rupee notes and Rs5 and Rs10 notes. After robbing the said amount of Rs.20,000/- from his possession, the accused
feasible to construct a Road Over Bridge (hereinafter referred
to as 'ROB') or a Road Under Bridge (hereinafter referred ... construction of a Road Over Bridge (hereinafter referred to as 'ROB') or
Road Under Bridge (hereinafter referred to as ?RUB?) in lieu
construction of a Road Over Bridge (hereinafter referred to as 'ROB') or
Road Under Bridge (hereinafter referred to as ?RUB?) in lieu ... Railway Stations (Virudhunagar Town).
17.2. The proposed site for the construction of ROB in lieu of existing
LC 403 at Railway
motorcycle bearing Registration No.TN-48-S-6522. At
knife point, they robbed her of a pair of ear studs weighing 1 gram ... private hospital and made a statement that she was raped and robbed
by four unknown persons. However, the respondent did not charge
the accused with
vide letter of Acceptance/Work Order IRCON/4016/TNRSP-01/ROBs/Sub & Super Structure/PKG-5B. The Scope of Work, allotted ... Order, was the Construction of Sub & Super Structure works for 3 ROBs at Sirkazhi BR 312, Ariyalur BR 380 & Vriddhaachalam BR 322 above
pursuance of the same, A1 to A3 actually committed the offence robbing a sum of Rs. 31.5 lakhs from the defacto complainant, that ... junction of Thambu Chetty Street and Mettu Street, in order to rob the same.
(iii) When the auto was nearing the junction of Thambu Chetty
Workmen Employed In Rob Roy Estates, ... vs Presiding Officer, Labour Court, ... on 27 April, 1964
Equivalent citations: AIR1965MAD364, AIR 1965 MADRAS 364, (1964) 2 LABLJ ... dispute relating to the claim of the staff members of the Rob Roy Estate for additional bonus for the years
occupied the riding surface of the service road of Road Over-bridge (ROB) portion, but also occupied the trestle portion of ROB (beneath the ROB ... deck portion). The encroachments in the trestle portion of the ROB obstruct the periodical maintenance of the ROB, which causes defect in structural stability