hours, the accused came
to be caught red handed along with the robbed
currency notes from the three different buses of
Gujarat State Road Transport ... nature of search and seizure was carried out
wherein not only the robbed currency notes were
Page 4 of 41
HC-NIC Page
recovered from his possession;
alongwith part of the robbed property [Ex.PW-28/P-3; Ex.PW-28/P-4].
Currency notes ... Bihar in search of 'X'; and recovered part of the
robbed property from the house of 'X' in Bihar [vide seizure
name of the customers of the plaintiff
(referred to as the ROB A/c. No. 404) to facilitate smooth
encashment of such refund vouchers which ... immediately given by
the plaintiff but the defendant arbitrarily debited the said ROB
A/c. No. 404 to the staggering amount
they
all started beating them with fist and kick blows.
They robbed his purse containing his driving
license, Voter I-Card, cash amount ... thigh as well as on left side of his neck
and robbed mobile phone and purse of Ranjit.
Thereafter, all four of them fled away
construction of a four-lane Road Over Bridge („ROB‟) and its
approaches from KM 259/4 to KM 263/4 in the Ahmedabad-Mumbai
section ... selected Entrepreneur was required to
design and construct the four-lane ROB and its approaches and also
maintain it for an agreed period known
necessary directions to the respondents
not to shift the Railway Over Bridge (ROB.) from railway
crossing 60B, 574/26-28 to 575/13-24 over ... line at
Maghnagar Industrial Area.
According to the petitioners, earlier construction of
ROB was finalised over Railway Crossing 60B at railway
crossing
Sahib. There is a proposal for construction of
a Railway Over Bridge (ROB) on the Railway crossing of Sri Muktsar Sahib-
Jalalabad road, whereupon ... aforesaid shops came in the alignment of the
construction of the ROB. Accordingly, the possession of the shops was to be
taken and in lieu
Sahib. There is a proposal for construction of a Railway
Over Bridge (ROB) on the Railway crossing of Sri Muktsar Sahib-Jalalabad
road, whereupon ... aforesaid shops came in the alignment of the construction
of the ROB. Accordingly, the possession of the shops was to be taken and in lieu
seeking a mandamus for an expeditious construction
of a Railway Over Bridge (ROB) on Kotkapura-Fazilka Railway Line,
passing through the Sri Muktsar Sahib-Jalalabad ... sides of the said road, resulting into delay in
construction of the ROB. The said writ petition was disposed of vide order
dated 07.04.2011 (Annexure
allotted due to a proposal for construction of a Railway Over Bridge (ROB)
on the Railway crossing of Sri Muktsar Sahib-Jalalabad road, whereupon ... aforesaid
shops came in the alignment of the construction of the ROB.
The challenge is based on the ground that the possession of the shops