family. He had visited the Ops and had checked their
sample flat. The complainant after giving the assurance and promises
of the opposite party that ... savings in the said flat but was
shocked to see that the flat sold to him was nothing like the sample
flat with regard
family. He had visited the Ops and had checked their
sample flat. The complainant after giving the assurance and promises
of the opposite party that ... savings in the said flat but was
shocked to see that the flat sold to him was nothing like the sample
flat with regard
flat was far below the standard shown in the
sample flat. Therefore, heavy costs is to be imposed on the OP and the
compensation ... proposition that the sample flat be exchanged with the flat allotted to the
complainant, OP clarified that the sample flat was a temporary
construction
specifications shown in the Brochure, Offer Letter dated
28.05.2011 and the Sample Flat shown to him;
Consumer Complaint ... assured that the same
would be in conformity with the Brochure, Sample Flat and
specifications, which were duly shown to him by its officials
from taking such pleas with regard to the lesser
area of the flat, at this belated stage as the complaint filed by the
complainant regarding ... flat was 1740 Sq. ft. It was
denied that the complainant had only believed on advertisement. Before
purchasing the flat, they had got the sample
year 2007. OP intimated vide letter dated 13.1.2009 that
the sample flat is likely to be completed in April, 2009 but the project
was late
registration in housing project Kharar for A-II, Flat measuring 1500
sq. ft. costing Rs. 24.30 lacs. Vide letter dated 29.5.2007, the same ... confirmed by Ops. Vide letter dated 13.1.2009, Ops intimated
that the sample flat is likely to be completed in April, 2009. Vide letter
dated
application to Ops for registration in
housing project Kharar for A-II, Flat measuring 1500 sq. ft. costing
Rs. 24.30 lacs. Vide letter dated ... confirmed
by Ops. Vide letter dated 13.1.2009, Ops intimated that the sample
flat is likely to be completed in April, 2009. Vide letter dated
complainants construction of row-house
is not made as per sample flat and also as per specifications which
were shown in the brochure. According
spot including a saw were also seized.
Sample of the blood found inside the flat came to be seized. Blood stained
clothes of accused persons ... found inside the flat
and on weapon 'Tabbar' seized from bed-room of the flat of accused
persons. Samples of blood