foundation civil
work and compound wall are in progress. Further, sample flat is
ready and site office is completed on site.
MPCB issued show-cause
Infrastructure Ltd. The Kingsburry
Apartments have 2999 Flats out of which 2050 flats are
occupied. There are 22 residential blocks in the entire project
There ... There are 375 flats are to be
constructed, out of which almost 200 flats are at possession
stage. Almost 50 flats have been occupied
having approx 800 flats. Almost 70% flats are occupied. The
deficiencies observed during inspection are as under: -
15
I. The estimated effluent generation ... There are
375 flats are to be constructed, out of which almost 200 flats are at
possession stage. Almost 50 flats have been occupied
District.
S. Description of Action Point Remarks
No.
1 Details of the sample collected from the During the inspection, no water was
water body ... room house
flats, Patelguda, Ameenpur (V&M), Sangareddy District.
S. Description of Action Point Remarks
No.
1 Details of the sample collected from
solid waste
would be generated per day.
13
g.. Approx 800 flats are occupied and 800 families are
currently residing in project. Approximately.
h. Assuming ... were found clogged and
filled with mud and stagnant water.
Results of sample analysis obtained from pit of RWH is tabulated below
Adil Ansari vs M/S. C.L. Gupta Export Ltd on 25 February, 2022
Author
phase-1, there are 584 flats (09 towers), out of
which possession of 581 flats have been given by
the promoter company ... Exiting STP of capacity 250 KLD is in operation
during visit. Sample of treated wastewater collection
tank has been collected during the visit
Uddar Gagan Properties Ltd vs Sant Singh & Ors on 13 May, 2016
Equivalent citations
Rameshwar vs State Of Haryana on 12 March, 2018
Equivalent citations: AIRONLINE 2018 SC 418
Meera Shukla vs Municipal Corporation Gorakhpur on 19 July, 2019
Bench: Adarsh Kumar Goel , K