downstream systems, midcourse correction for transmission system to the extent possible should be made in terms of (i) Reconfiguration of planned transmission system, (ii) Phasing ... review the inter-State transmission system in the event of change in commissioning schedule of upstream and downstream system, shift of target region, phase
downstream systems, midcourse correction for transmission system to the extent possible should be made in terms of (i) Reconfiguration of planned transmission system, (ii) Phasing ... review the inter-State transmission system in the event of change in commissioning schedule of upstream and downstream system, shift of target region, phase
high-yielding and short-duration varieties on shifts in cropping patterns. Concepts of various cropping and farming systems. Organic and Precision farming. Package of practices
Andhra Pradesh Metropolitan Region and Urban Development Authorities Act, 2016
ANDHRA PRADESH
India
Andhra Pradesh
presence shall upload all requests from subscribers into the central recordkeeping agency system within the timelines laid down under any service standards or in accordance ... Pension Fund Regulatory and Development Authority (Exit and Withdrawal under National Pension System) Regulations, 2015, as amended. The point of presence shall not collect from
continuity and availability of adequate air pressure in the train brake system upto the last vehicle. Provided further that such a train shall be worked ... attached to the train and if any such load has shifted or requires adjustment, he shall have it secured or the wagon detached from
Haryana Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Rules, 2018
2006/Metering Communication and Data Acquisition Requirements (MCDAR) for Intra-State Power System of Uttarakhand as amended from time to time. (7) Provision for remote ... installations shall be provided as required by the system operator or wherever considered necessary by the Distribution Licensee. (8) Prepaid meters installed at the consumer
effect from 1st of July, 2017, which has brought about a paradigm shift by replacing multiple indirect tax levies of Centre and of the States ... Central Government with input tax credit facilities: And Whereas the existing system of tax exemption is not compatible to GST regime and hence tire
context of the Act,- (i) widening of roads, streets, lanes (ii) shifting the alignment of roads, streets, lanes, (iii) erecting of flyovers with or without ... conveniences, (x) any project related with public transport like Bus Rapid Transit System (BRTS), Metro etc., (xi) erection of Economically Weaker Section (EWS) Housing